Laserfiche WebLink
o Continuing the process of collecting water service data and upgrading water meters and <br />MIUs in park buildings. <br />o Collected water samples for bacteriological testing. <br />o Continued the Sanitary Sewer Cleaning Program for 2021 — 32% completed. <br />o Continued working with engineering staff on the Long Lake sanitary sewer lift station <br />proj ect. <br />o Continued working with AE2S on the 2021 SCADA System Upgrades <br />o Continued laundering towels weekly used by office personnel for cleaning work areas. <br />o Completed painting fire hydrants for 2021 — 166 hydrants painted. <br />o Repaired the electric lock to front office to Park and Rec. <br />o Repaired one -bathroom fixture and a backed -up sink in the PD. <br />A: 2021 Roseville Project Map <br />B: September Development Activity Report <br />