Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 28, 2021 Item No: 4 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• 2021 Pavement Management Project <br />o The contract was awarded to Bituminous Roadways, Inc. on April 12. Work consisted <br />of 8.7 miles of road resurfacing. Additionally, signal modifications to Snelling and <br />Lydia were included. A new pathway was also be installed on Rice Street between <br />County Road C2 and Woodlyn Avenue. <br />o All major work is completed. <br />Ramsey County Ditch 4 Storm Sewer & Twin Lakes Trail Improvements <br />o Bids were opened on March 15 and the contract was awarded to Meyer Contracting on <br />March 22. Work involved replacing the existing ditch with an 84" pipe, grading and <br />installing a 10-foot wide bituminous trail over the pipe, lighting, landscaping and tree <br />installation. All pipe work and major grading is completed. Concrete work will be <br />completed early next week and the trail should be fully opened by the week of <br />October 6. <br />2021 Sewer Lining <br />o The contract was awarded to Visu-Sewer on November 30, 2020. The project consists <br />of lining 7.12 miles of pipe within the city. Work has been ongoing since December <br />and is 95% complete. All work is expected to be completed on the project by the end of <br />August. <br />• St Rose of Lima Drainage Improvements <br />o Bids were opened on February 3 and a contract was awarded to OMG Midwest on <br />February 22. The project is a joint project with Ramsey Washington Metro Watershed <br />District. Work involves reducing the impervious amount of the parking lot, installation <br />of rain gardens and installation of an underground storage system. The improvements <br />will reduce runoff and provide treatment which should help reduce flooding in the <br />neighborhood. Work began on July 16. The majority of the parking lot improvements <br />are completed. The underground storm sewer work is currently being constructed and <br />the project should be completed by mid -October. <br />• Marion Street Pathway <br />o The project was awarded on August 23. <br />o Work involves the installation of aggregate base, paving, ADA curb ramps and signage <br />related to a new trail being completed in conjunction with the Enclave Development <br />which will connect the trail on South McCarron's Boulevard to Marion Street. The <br />