• Watermain replacement — County Road B, Dellwood Street to Lexington Avenue <br />o This section is proposed to be replaced due to high water break history. <br />o The project will be done in conjunction with Xcel Energy's gas replacement <br />proj ect. <br />Lift Stations: <br />The Long Lake Lift Station, located on Long Lake Road south of County Road D will be <br />replaced in 2022 with a grinder pump lift station. The new lift station will be relocated <br />further from the road to protect the lift station and to make it safer to maintain and on higher <br />ground as it is currently subject to street flooding. <br />The Dale/Owasso Lift Station, located at Dale Street/S Owasso Boulevard, will be upgraded <br />in 2023. Work will begin on design for this lift station which will include pump and <br />electrical upgrades and a new backup generator. <br />Storm sewer system improvements: Staff continues to analyze the existing drainage <br />systems and localized flooding issues and is identifying mitigation projects. Staff is now <br />working on developing a 2022 drainage improvement project to alleviate some of these <br />flooding concerns. Staff has already identified several projects for 2022. Some of the <br />projects include: <br />Pavement Management Storm Water Upgrades: Miscellaneous storm sewer <br />upgrades. <br />Fairview & County Road C Storm Water Improvements <br />o Replace the existing outlet with a new outlet control structure (OCS). The <br />new OCS will provide better control of the pond and make maintenance <br />easier. The new OCS will prevent large debris from entering the new 84" <br />storm pipe that replaced RCD 4. The improvements will provide some <br />additional storage. <br />• County Road C2 & Simpson Street Underground <br />o A new underground storm pipe will be installed to detain water in the area <br />which will reduce flooding that occurs in the intersection. <br />4. Other Improvements: <br />Snelling Avenue Improvements (MNDOT): MnDOT will add a new median cable barrier <br />on Snelling Avenue between County Road C and I-694. As part of the project, MnDOT will <br />extend the southbound left turn lane at Lydia Avenue to provide more storage. <br />Th 36 & Hamlin Avenue Signal Replacement (MNDOT): MnDOT will be replacing the <br />signal at the westbound ramps to TH 36 and Hamline Avenue (entrance to Cederholm). The <br />new signal project will include upgrades to ADA ped ramps. <br />Lexington Avenue/County Road B2 Intersection Improvements: The intersection will be <br />upgraded to add turn lanes on County Road B2 as well as other geometric improvements to <br />help the traffic flow in the area. Additionally, the signal system will be replaced along with <br />other miscellaneous upgrades including drainage and retaining walls. <br />