My WebLink
|
Help
|
About
|
Sign Out
Home
2021_1123_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_1123_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 3:37:27 PM
Creation date
11/24/2021 3:36:22 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Road B2 Resurfacing: The remaining work is a carryover from the 2021 project <br />which was not completed. The County will be resurfacing County Road B2 between <br />Fairview Avenue and Snelling Avenue. A new pathway will be constructed between <br />Snelling ramps on the north side of B2 under the Snelling Bridge. A new signal system will <br />be installed at Fairview Avenue and County Road B2. <br />Lexington Avenue Resurfacing: Lexington Avenue between TH 36 and County Road C2 <br />will be resurfaced. Upgrades will include spot curb repair and updated ADA pedestrian <br />ramps. <br />Pedestrian Flashers: The existing pedestrian flasher at Lexington Avenue and Central Park <br />is in need of replacement due to age and will be upgraded to a RRFB system. <br />5. Other Projects <br />Xcel Gas will be replacing a major gas line on County Road B between Hamline Avenue and <br />Lexington Avenue and on Hamline Avenue between County Road B and County Road C in <br />2022. <br />The overall cost of the Public Works 2022 Work Plan for Roseville is approximately $6 million <br />dollars. <br />Recommended Action: <br />Receive presentation and comment on the 2022 work plan. <br />Attachments: <br />A. Preliminary Project Map <br />B. Presentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.