Laserfiche WebLink
County Road B2 Resurfacing: The remaining work is a carryover from the 2021 project <br />which was not completed. The County will be resurfacing County Road B2 between <br />Fairview Avenue and Snelling Avenue. A new pathway will be constructed between <br />Snelling ramps on the north side of B2 under the Snelling Bridge. A new signal system will <br />be installed at Fairview Avenue and County Road B2. <br />Lexington Avenue Resurfacing: Lexington Avenue between TH 36 and County Road C2 <br />will be resurfaced. Upgrades will include spot curb repair and updated ADA pedestrian <br />ramps. <br />Pedestrian Flashers: The existing pedestrian flasher at Lexington Avenue and Central Park <br />is in need of replacement due to age and will be upgraded to a RRFB system. <br />5. Other Projects <br />Xcel Gas will be replacing a major gas line on County Road B between Hamline Avenue and <br />Lexington Avenue and on Hamline Avenue between County Road B and County Road C in <br />2022. <br />The overall cost of the Public Works 2022 Work Plan for Roseville is approximately $6 million <br />dollars. <br />Recommended Action: <br />Receive presentation and comment on the 2022 work plan. <br />Attachments: <br />A. Preliminary Project Map <br />B. Presentation <br />