74 County Road B, Dellwood to Lexington Avenue <br />75 o This section is proposed to be replaced due to a high water break history. <br />76 o This project will be done in cooperation with Xcel’s gas replacement project. <br />77 Lift Stations: The Long Lake Lift Station, located on Long Lake Road south of County Road D, <br />78 will be replaced in 2022 with a grinder pump lift station. The new lift station will be relocated <br />79 further from the road to protect the lift station and to make it safer to maintain. It also places the <br />80 lift station on higher ground as it is currently subject to street flooding. <br />81 Staff will begin work with our design consultant on the Dale/Owasso Lift Station located at Dale <br />82 Street and South Owasso Boulevard for future replacement in 2025. The lift station will be <br />83 rehabbed and a new backup emergency generator will be installed. <br />84 Storm Sewer System Improvements: Staff continues to analyze the existing drainage systems <br />85 and localized flooding issues and is identifying mitigation projects. Staff is now working on <br />86 developing a 2022 drainage improvement project to alleviate some of these flooding concerns. <br />87 Staff has already identified several projects for 2022. Some of the projects include: <br />88 Pavement Management Storm Water Upgrades: Miscellaneous storm sewer upgrades. <br />89 Installation of an underground storm sewer chamber near Simpson Street and County <br />90 Road C2: This will reduce flooding in the area. <br />91 Improvements to the storm water basin at Fairview Avenue and County Road C: The <br />92 existing pond will be expanded slightly to provide more storage and replacement of <br />93 the outlet structure with a new outlet control structure to provide a safer outlet, which <br />94 will also protect the new pipe installed downstream last year. <br />95 4. Other Improvements: <br />96 Minnesota Department of Transportation (MnDOT): <br />97 Snelling Avenue Improvements <br />98 o Install cable median barrier between Co. Rd. C and I-694. <br />99 o Extend left turn lanes at Lydia Avenue, County Road C2 and County Road C. <br />100 Signal Replacement at Hamline Avenue and West Bound TH 36 ramps <br />101 • Access to Cederholm will be accommodated at all times. <br />102 • Intersection will be a 4-way stop for the majority of the improvements. <br />103 • Work will begin in September 2022. <br />104 Ramsey County <br />105 Lexington Avenue Resurfacing <br />106 o TH 36 – County Road C2. <br />107 County Road B2/Lexington Avenue Improvements <br />108 o Replace Signal. <br />109 o Geometric improvements including additional turn lanes. <br />110 o Work to be done between June and August. <br />Page 3 of 5 <br /> <br />