Laserfiche WebLink
Page 3 of 6 <br />Not recommended. 73 <br /> 74 <br />Alternate #7: Remove base bid expansion joint at center island. (-$12,000) 75 <br />Not recommended. 76 <br /> 77 <br />Alternate #8: Remove alternate bid at center island. (-$2,000) 78 <br />Not recommended. 79 <br /> 80 <br />The lowest non-qualifying base bid for this package was submitted by the Corval Group. However, 81 <br />they were found to not meet the Quality Assurance requirement of five similar rink projects within the 82 <br />last five years (Attachment B). As a result, it is recommended that their proposal be removed from 83 <br />consideration. The city attorney has reviewed the material and is comfortable with this 84 <br />recommendation. 85 <br /> 86 <br />The lowest qualifying bid was submitted by Total Mechanical Inc. They have supplied the necessary 87 <br />insurance and bond requirement. 88 <br /> 89 <br />The Total Mechanical Inc. Base Bid is $1,845,000. Inclusion of each of the recommended alternates 90 <br />(alternate #3 and #5) would add a cost of $97,450, for a package total of $1,942,450. 91 <br /> 92 <br />Project clarification has been successfully conducted with Total Mechanical Inc. 93 <br /> 94 <br />Bid Package 2: Site 95 <br />Nine bids were received for Bid Package 2. Attached is a bid result summary (Attachment C). A brief 96 <br />description of each bid package component is listed below. 97 <br /> 98 <br />Base Bid: Lump sum for all labor, materials, equipment, and services necessary for and 99 <br />incidental to the package. $914,450 100 <br /> 101 <br />Alternate #1: Furnish and install and additional run of drain tile. $20,000 102 <br /> Recommended for inclusion. 103 <br /> 104 <br />Alternate #2: Furnish and install an additional 12 inch section of select granular material 105 <br />under new pavement. $60,000 106 <br />Recommended for inclusion. 107 <br /> 108 <br />Alternate #3: Furnish and install new ADA ramp with railing. $43,500 109 <br />Recommended for inclusion. 110 <br /> 111 <br />Alternate #4: Delete new areas of concrete pavement with trench drains in center islands of 112 <br />oval and install sod. (-$96,000) 113 <br />Not recommended. 114 <br /> 115 <br />Alternate #5: Furnish & install concrete pavement with snowmelt section in new ADA ramp. 116 <br />$0.00 117 <br />Recommended for inclusion. 118 <br /> 119 <br />The lowest base bid for this package was submitted by Goodmanson Construction Inc. They have 120 <br />supplied the necessary insurance and bond requirement. 121