Laserfiche WebLink
Page 5 of 6 <br /> Acceptance of the Total Mechanical Inc. Base Bid would be a cost of $1,845,000. Inclusion of each 152 <br />of the recommended alternates (alternate #3 and #5) would add a cost of $97,450, for a package total 153 <br />of $1,942,450. 154 <br />Acceptance of The Goodmanson Construction Inc. Base Bid would be a cost of $914,450. Inclusion 155 <br />of each of the recommended alternates (alternate #1, #2, #3 and #5) would add a cost of $123,500, for 156 <br />a package total of $1,037,950. 157 <br />The current estimate for the Package 3: Padding System is $326,600. 158 <br />At this time, the city intends to continue to carry the recommended contingency on all outstanding 159 <br />work, for an anticipated project total of $3,900,000. 160 <br />There are $3,900,000 available for this project in state bond funds. 161 <br />STAFF RECOMMENDATION 162 <br />Based on the bid results and the recommendation of our technical experts, it is recommended that 163 <br />Bid Package 1: Refrigeration be awarded to Total Mechanical Inc, including alternates #3 and #5. 164 <br /> 165 <br />The contractor has supplied the necessary bond and is qualified to provide the necessary work. 166 <br /> 167 <br />Based on the bid results and the recommendation of our technical experts, B32 (Attachment C), it is 168 <br />recommended that Bid Package 2: Site be awarded to Goodmanson Construction including alternates 169 <br />#1, #2, #3 and #5. 170 <br />The contractor has supplied the necessary bond and is qualified to provide the necessary work. 171 <br />REQUESTED COUNCIL ACTION 172 <br />Motion authorizing the acceptance of the base bid for Bid Package 1: Refrigeration in the amount of 173 <br />$1,845,000 and authorize alternate #3 (add central control system) and #5 (add radiant heating to 174 <br />new ADA ramp) in the amount $97,450 for a total of $1,942,450 and award the contract to Total 175 <br />Mechanical Inc. as the lowest qualified bidder; conditioned upon the contractor’s timely and 176 <br />satisfactory execution of all necessary Contract Documents and related obligations, as set for in the 177 <br />Bid Documentation. 178 <br />Motion authorizing the acceptance of the base bid for Bid Package 2: Site in the amount of $914,450 179 <br />and authorize alternates #1 (furnish and install an additional run of drain tile), #2 (furnish and install 180 <br />an additional 12 inch section of selection of select granular material under new pavement), #3 181 <br />(furnish and install new ADA ramp with railing) and #5 (Furnish & install concrete pavement with 182 <br />snowmelt section in new ADA ramp) in the amount of $123,500 for a total of $1,037,950 and award 183 <br />the contract to Goodmanson Construction Inc. as the lowest qualified bidder; conditioned upon the 184 <br />contractor’s timely and satisfactory execution of all necessary Contract Documents and related 185 <br />obligations, as set for in the Bid Documentation. 186 <br />Motion to reject alternates #1, #2, #4, #6, #7 and #8 of Bid Package 1 at this time. 187 <br />Motion to reject alternate #4 of Bid Package 2 at this time. 188 <br /> 189 <br />Prepared by: Matthew Johnson; Assistant Director of Parks and Recreation