Laserfiche WebLink
<br />2211 O’Neil Road, Hudson, WI 54016 t 651.256.3090 <br />www.b32eng.com <br />B32 ENGINEERING GROUP, INC. <br />February 7, 2022 <br /> <br />Mr. Lonnie Brokke <br />Director of Parks and Recreation <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br /> <br />Re: Guidant John Rose MN Oval – Ice System Improvements <br /> Bid Summary Letter <br /> <br />Dear Mr. Brokke: <br /> <br />On Thursday January 27, 2022 bids were opened for the Ice System Improvements at the Roseville <br />City Hall. The project was divided into two (2) bid packages; Bid Package 1 for refrigeration <br />system improvements and Bid Package 2 for site Improvements. <br /> <br />Bid Package 1 - Refrigeration <br />The table below lists the two (2) bids that were received. The engineer's estimate is also included <br />based on the January 27, 2022 cost estimate presented to the City prior to the bid opening. <br /> <br /> Engineer’s <br />Estimate* Corval Group Total Mechanical <br />Services, Inc. <br />Total Base $1,970,502 $1,793,875 $1,845,000 <br />Alt 1: Replace all secondary brine piping $100,000 $266,916 $261,000 <br />Alt 2: Reused existing brine pumps ($20,000) ($42,522) ($31,000) <br />Alt 3: Add Ice rink central control system $60,000 $103,607 $76,450 <br />Alt 4: Remove water preheat waste heat recovery ($40,000) ($30,522) ($34,250) <br />Alt 5: Add radiant heating at new ADA ramp $15,000 $18,130 $21,000 <br />Alt 6: Alternate expansion joint material (DS Brown) ($69,800) ($8,890) ($24,000) <br />Alt 7: Remove base bid joint at center islands ($28,800) ($50,130) ($12,000) <br />Alt 8: Removal Alt Bid 6 expansion joint material <br />around new concrete slab in center of oval ($16,000) ($11,600) ($2,000) <br />*The Engineer’s Estimate does not include the recommended 8% contingency to be carried during construction. <br /> <br />The close spread between the two (2) base bids indicates the project was bid very competitively <br />and that both contractors had a clear understanding of the design and bidding documents. The <br />pricing for the majority of the alternate bids were fairly close to one another as well. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Attachment C