Laserfiche WebLink
EJCDC® C-510, Notice of Award. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 of 1 <br />SECTION 005100 <br />NOTICE OF AWARD <br />Date of Issuance: <br />Owner:City of Roseville, Minnesota Owner’s Project No.:NA <br />Engineer: <br />BEngine <br />B32 Engineering Group, Inc.Engineer’s Project No.:900-21-427 <br />Project:Guidant John Rose MN Oval Ice System Improvements <br />Contract Name:Bid Package 1 - Refrigeration <br />Bidder: <br />Bidder’s Address: <br />You are notified that Owner has accepted your Bid dated [date] for the above Contract, and that you are <br />the Successful Bidder and are awarded a Contract for: <br />[Describe Work, alternates, or sections of Work awarded] <br />The Contract Price of the awarded Contract is $[Contract Price]. Contract Price is subject to adjustment <br />based on the provisions of the Contract, including but not limited to those governing changes, Unit Price <br />Work, and Work performed on a cost-plus-fee basis, as applicable. <br />4 unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the <br />Contract Documents accompanies this Notice of Award, or has been transmitted or made available to <br />Bidder electronically. <br />☐ Drawings will be delivered separately from the other Contract Documents. <br />You must comply with the following conditions precedent within 15 days of the date of receipt of this <br />Notice of Award: <br />1. Deliver to Owner 4 counterparts of the Agreement, signed by Bidder (as Contractor). <br />2. Deliver with the signed Agreement(s) the Contract security (such as required performance and <br />payment bonds) and insurance documentation, as specified in the Instructions to Bidders and in <br />the General Conditions, Articles 2 and 6. <br />3. Other conditions precedent (if any): [Describe other conditions that require Successful Bidder’s <br />compliance] <br />Failure to comply with these conditions within the time specified will entitle Owner to consider you in <br />default, annul this Notice of Award, and declare your Bid security forfeited. <br />Within 10 days after you comply with the above conditions, Owner will return to you one fully signed <br />counterpart of the Agreement, together with any additional copies of the Contract Documents as <br />indicated in Paragraph 2.02 of the General Conditions. <br />Owner:City of Roseville, Minnesota <br />By (signature): <br />Name (printed): <br />Title: <br />Copy: Engineer <br />Attachment D