My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03072022
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
CCP 03072022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2022 11:35:24 AM
Creation date
3/3/2022 11:35:17 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/7/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 More information on the study can be found on MnDOT’s webpage for this study: <br />17 https://www.dot.state.mn.us/metro/projects/i35w-north-gateway/index.html <br />20 Representatives from MnDOT and their consultant, HDR, Inc., will be present to share an update <br />21 and answer questions from the Council. <br />22 F INANCIAL I MPACTS <br />23 The current study is being funded by the Minnesota Department of Transportation. There is not a <br />24 scheduled or funded project for this stretch of 35W yet. Once the project is programmed, there may <br />25 be some local cost participation on the part of Roseville depending on what elements are included in <br />26 the final project. <br />27 S TAFF R ECOMMENDATION <br />28 Staff recommends that the City Council receive a presentation from the 35W North Gateway study <br />29 team and provide input. <br />30 R EQUESTED C OUNCIL A CTION <br />31 None. <br />Prepared by:Marc Culver, Public Works Director <br />Attachments:A: Presentation <br />Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.