Laserfiche WebLink
Attachment B <br />Mr. Paschke explained there was an EAW done for this project and through that process it put <br />41 <br />42 together mitigations to address those impacts. From a City standpoint they were pretty concerned <br />43 about the added traffic from this site as was Ramsey County, however the study came back and did <br />44 not indicate that there were any major outstanding issues where there would need to be major <br />45 improvements to the roadway. The signal light going in on Hershel is actually an improvement and <br />46 will assist in helping the traffic flow better and slow traffic down as well asto allow for proper <br />47 movement of vehicles turning left onto or off of County Road C. <br />48 Chair Kimble closed the public hearing at 7:14 p.m. <br />49 MOTION <br />50 Member Pribylmoved, seconded by Member Kruzel,to recommend to the City Council <br />th <br />51 approval of the proposed Twin Lakes 4Addition Preliminary Plat, based on the content of <br />52 the RPCA, public input, and Planning Commission deliberation with the two conditions listed <br />53 in the report(PF22-020). <br />54 Ayes: 7 <br />55 Nays: 0 <br />56 Motion carried. <br /> <br />