Laserfiche WebLink
31 a.The site, building placement, and drive-through lane shall be constructed substantially <br />32 consistent with the plans submitted February 18, 2022, and provided as a component of the <br />33 report packet, unless otherwise revised to comply with Zoning Code standards. <br />34 b. The applicant and their landscape consultant shall work with Planning Division staff on a full <br />35 site landscaping and specifically an appropriate screen for the southern curves ofthe drive- <br />36 through lane to minimize or eliminate vehicle headlight impacts to County Road C. <br />37 A LTERNATIVE A CTIONS <br />38 a.Pass a motion to table the item for future action. An action to table must be tied to the need <br />39 of clarity, analysis and/or information necessary to make a recommendation on the request. <br />40 Tabling beyond April 19, 2022, would require extension of the 60-day action deadline <br />41 established in Minn. Stats. 15.99. <br />42 b. Pass a motion denying the proposal. An action to deny must include findings of fact <br />43 germane to the request. <br />Report prepared by: Thomas Paschke, City Planner, 651-792-7074 <br /> thomas.paschke@cityofroseville.com <br />Attachments: A. PC Packet B. March 2, 2022, PC minutes <br /> C. Draft CU resolution <br />PF21-020_Take5CW_CU_RCA_032122 <br />Page 2 of 2 <br /> <br /> <br />