My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0125_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0125_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 11:36:27 AM
Creation date
5/12/2022 11:33:43 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/25/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: January 25, 2022 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2022 Sewer Lining <br />o The contract was awarded to Hydro-Klean on December 6, 2021. The project consists <br />of lining 5.6miles of pipe within the city. Work is anticipated to begin in late January <br />and be completed by the Fall of 2022. <br />o Civic Campus Pre -Design Project: The City has hired BKV Group to continue the Civic <br />Campus Master Plan planning and concept design to further develop the concepts for <br />the Maintenance Facility, the License and Passport Center and the VFW in order to <br />better define costs and phasing plans. This project is also helping us as we possibly <br />seek to use Local Sales Tax revenue to fund the actual construction of these facilities. <br />Ramsey County Updates: <br />• County Road B2 Resurfacing and Signal Improvements <br />o Work on the three signals east of Fairview is completed and all signals are operational <br />and the pavement work between Snelling and Hamline is completed. The signal at the <br />Fairview and County Road B2 intersection will be replaced next spring. The pavement <br />between Fairview and Snelling and the new trail under the Snelling bridge will be <br />completed next spring as well. <br />Council Update: <br />Below is a highlight of items recently presented to and/or acted on by the City Council. More <br />information can be found in the agenda packets and minutes for the referenced Council meeting. <br />• December 6"' Meeting: <br />o Approved 2022 Budget, Utility Rates and Fee Schedule <br />o Approved Victoria Shores EAW <br />• January 10"' Meeting: <br />o Approved 2022 Public Works Work Plan <br />o Discussed proposed changes to the process for recruiting Commission members as well <br />as other recommendations for Commissions in general. (further discussion scheduled <br />for January 241h meeting) <br />o Discussed Local Option Sales Tax and related projects: Originally the City was <br />considering using a Local Sales Tax to fund several transportation projects in an <br />extended area around Rosedale Mall. However, during the special session of the State <br />Legislator this summer, provisions were added to the Statute which authorizes the Local <br />Sales Tax defining what a qualifying regional project is. This definition excluded <br />transportation projects, except for contiguous trails. Therefore, the City is shifting its <br />
The URL can be used to link to this page
Your browser does not support the video tag.