Regional Transportation Project Concept Design Review January 5, 2022 <br />Page 8 <br />I�N441MIILl1_1WLd61111 "It IIMF_11*1 <br />Preliminary cost estimates were established for the concepts developed as part of this effort. The cost <br />estimates include construction material costs based on the facility type, as well as account for <br />potential pedestrian ramp/driveway apron modifications, utility relocations, tree removal, curb -and - <br />gutter, and retaining walls, where applicable. The costs also include percentage estimates for <br />engineering/design, parcel/right-of-way impacts, drainage, mobilization, and general contingency. <br />Cost shown are in current year dollars. A summary of the preliminary cost estimate for each project is <br />in Table 2. <br />Table 2 Regional Transportation Project Cost Estimate Summary <br />Project <br />Type <br />Roadway <br />Project Description (ID) <br />Cost Estimate <br />Interchange <br />SnellingCR venue / <br />Interchange Construction <br />$30M to $50M <br />Multimodal <br />Cleveland Avenue <br />CR D to CR C Sidewalk (1A-1 C) <br />$1.3M <br />Multimodal <br />Fairview Avenue <br />CR D to CR C2 Trail (2) <br />$1.6M <br />Multimodal <br />Snelling Avenue <br />Old Snelling Avenue to CR C Trail (3) <br />$1.OM <br />Multimodal <br />Lydia Avenue <br />Snelling Avenue to Hamline Avenue Sidewalk (4) <br />$0.5M <br />Multimodal <br />Hamline Avenue <br />Snelling Avenue to CR C2 Trail (5A) <br />$1.8M <br />Multimodal <br />Hamline Avenue <br />Terrace Drive to CR C Sidewalk (513) <br />$0.8M <br />Multimodal <br />County Road C2 <br />Arona Street to Hamline Avenue Sidewalk (6) <br />$0.7M <br />Multimodal <br />Fairview Avenue <br />Twin Lakes Parkway to CR B2 Trail (7) <br />$1.9M <br />Multimodal <br />Snelling Avenue <br />Oakcrest Avenue to CR B2 Trail (8) <br />$0.7M <br />Multimodal <br />Snelling Avenue <br />Commerce Street to CR B Trail (9) <br />$0.1 M <br />Bridge / Trail <br />Rosedale to HarMar <br />Connection <br />Trail / Bridge Construction (10B, 10E) <br />$11 M to $16M <br />TOTAL <br />$51 AM to $76AM <br />. All costs shown represent current year costs and do not include any inflation. <br />