My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0222_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0222_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 12:04:32 PM
Creation date
5/12/2022 11:57:24 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/22/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br />BKV <br />G R O U P <br />uxxscx r.0 <br />LJ� <br />F <br />EXISTING ROSEVILLE CIVIC CAMPUS <br />Jk <br />Although the Roseville Ice Arena and the Guidant John Rose MN Oval [referred to herein as <br />'Skating Center'] are located directly west of the Clty's Civic Campus, the Skating Center was <br />excluded from this planning given the understanding that the facility's spatial needs are currently <br />met. The City also identified the desire and need to retain the area known as Memorial Park in Its <br />current location, located along the western edge of the City Hall facility. The park area includes lit <br />flags and landscaping. <br />VFW - Post 7555, located west of the License Center and north across Woodhlll Drive from the <br />current Roseville Maintenance buildings and yard, sits on a site surrounded by city -owned property <br />and Veteran's Park. Including the VFW as a key project stakeholder allowed the city to explore <br />options that would relocate the VFW to allow the site north of Woodhlll to be used fully and <br />efficiently while keeping this valuable community asset In its current neighborhood. <br />PROJECT GOALS <br />The following project goals were developed by the Planing Committee as a tool to inform the <br />decision -making process and to shape development of master planning recommendations. It was <br />Important to the committee that these goals be inclusive of use, function, impact to staff and to <br />residents, and Include aspirational ideas to guide this work and future design implementation. <br />Operational efficiency <br />Cohesive Civic Campus <br />Address current and long-term needs of stakeholders <br />Increase community access <br />Enhance civic identity <br />Balance fiscal responsibility and value <br />ROSEVILLE CIVIC CAMPUS MASTER PLAN STUDY ABKV GROUP I OERTEL ARCHITECTS 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.