BV <br />COST PROJECTIONS c e -o-u P <br />Building Construction <br />$10,699,277 <br />$7,458,118 <br />$5,892,195 <br />$7,110,376 <br />Cost <br />Site Construction Cost <br />$1,000,000 <br />$478,693 <br />$804,154 <br />$262,234 <br />Design Contingency <br />$1,169,927 <br />$793,681 <br />$669,634 <br />$737,261 <br />(10%) <br />Construction <br />$643,460 <br />$436,524 <br />$368,299 <br />$405,493 <br />Contingency (5%) <br />Soft Costs & Owner's <br />$4,276,539 <br />$2,925,435 <br />$2,461,707 <br />$2,727,912 <br />Contingencies <br />Total Project Costs <br />$17,789,203 <br />$12,092,451 <br />$10,195,989 <br />$11,243,276 <br />NOTES: <br />• Total project costs to be escalated at 4% each year until projected midpoint of construction. <br />• Reuse of the existing maintenance building would save between $700,000 and $1,000.000, subject to final design. <br />• License Center and City Hall costs shown in 2020 dollars, as these are anticipated to be later phases. Before soliciting <br />design services, project budgets should be updated using escalation per annum. <br />• A portion of City Hall interior renovation will be required near term to support currently identified operational changes. <br />• Master plan option C.2 will include higher site costs due to the required utility and street modifications. <br />Building & Site $700,000 - $800,000 $6,000,000 - $6,600,000 <br />Construction Cost <br />Soft Costs & $400,000 - $500,000 $3,200,000 - $3,500,000 <br />Contingencies <br />Total Project Costs $1,100,000 - $1,300,000 $9,200,000 - $10,100,000 <br />[Listed in 2020 Dollars] _ <br />CITY HALL PHASED RENOVATIONS: <br />• Near Term: Focused inferior renovations to support operational changes already planned. Work will be interior to the <br />building, with required modifications to building HVAC, lighting, power and IT to support new space configurations. <br />• Long Term: Building expansion and renovation to provide dedicated City Hall vehicle storage and expanded City Hall <br />Administrative offices to align with operational and space needs as they evolve with the community. <br />- Extents vary with planning scheme re: potential re -use of current Maintenance buildings for a portion of this <br />scope. <br />- Reevaluation of additional office space will be needed once post-COVID operations are normalized. <br />27 7BKV GROUP I OERTEL ARCHITECTS ROSEVILLE CIVIC CAMPUS MASTER PLAN STUDY <br />