My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0628_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0628_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 11:50:22 AM
Creation date
6/24/2022 11:49:25 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/28/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: June 28, 2022 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2022 Sewer Lining <br />o The contract was awarded to Hydro-Klean on December 6, 2021. The project consists <br />of lining 5.6 miles of pipe within the city. Work has begun with about 75% of the work <br />completed within Roseville. Work is anticipated to be completed by the Fall of 2022. <br />• Lexington Watermain <br />o The contract was awarded to SGP Contracting, Inc. on March 7, 2022. The project <br />consisted of replacing watermain on Lexington Avenue from the railroad tracks south of <br />County Road C to Woodhill Drive to the north. All work was completed in early June. <br />County Road B Watermain <br />o This contract was awarded to Northdale Construction on April 11. Work consisted of <br />replacing the watermain under County Road B between Merrill Street and Lexington <br />Avenue by open cutting. This project is being done in conjunction with Neel's Gas <br />Project. All watermain work was completed on June 17. Restoration will take place <br />after Neel installs the gas main. <br />o Traffic control on the project is in place. Traffic will be reduced to westbound only and <br />will continue until the Neel project is completed in late September. <br />• 2022 Pavement Management Project <br />o The project was awarded to Bituminous Roadways on April 11. <br />o Work consists of mill and overlaying 9.4 miles of roadways, installation of new <br />pathway on Lexington Avenue north of Woodhill Drive, replacement of retaining wall <br />at County Road C2/Merrill Avenue and other miscellaneous work. <br />o Minimal traffic impacts are anticipated for most of the work. <br />o Work is underway and will continue throughout the summer. Milling and paving will <br />begin in mid -July. <br />Fairview and County Road C Pond Improvements <br />o The project was awarded to New Look Construction on June 6. <br />o Work consists of pond dredging and outfall replacement at the Fairview and County <br />Road C pond. <br />o Work is expected to begin in later summer. Work should take approximately 3-4 <br />weeks. There should be minimal impacts to the public. <br />• Civic Campus Pre -Design Project <br />o The City has hired BKV Group to continue the Civic Campus Master Plan planning and <br />concept design to further develop the concepts for the Maintenance Facility, the License <br />and Passport Center and the VFW in order to better define costs and phasing plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.