Laserfiche WebLink
ATTACHMENT A <br />SECTION 6 – PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br />Concrete is poured and iced rinkarea has same dimensions as shop <br />Assumption 1: <br />drawing indicates <br />If our assumption was incorrect, we will work with the City of Roseville and <br />project team to plan for additional padding if larger or reduce pad sizing if <br />Solution / Strategy: smaller. <br />- Costs could occur if an additional pad is needed along with <br />additional time to produce added pad cover/foam. <br />Assumption 2: <br />Solution / Strategy: If our assumption was incorrect, we will…. <br />Assumption 3: <br />Solution / Strategy: If our assumption was incorrect, we will…. <br /> <br />