Laserfiche WebLink
ATTACHMENT A <br />ATTACHMENT F <br />PROJECT CAPABILITY PLAN <br />capability to <br />with a plan that meets time and cost goals. The capability claims should <br />be prioritized (list the most important claimsfirst). The Respondent may add or delete Project Capability <br />Claim table templates, but do not exceed the 2-pagelimit. Do NOT include any identifying information in <br />e the <br />Respondent has used the approach or solution previously, and what the results were in terms of verifiable <br />metrics. <br />Extensive knowledge of what is required for maximum protection to athletes <br />Project Capability 1 Claim: <br />Documented Performance:Past performance with supplying multiple major Speed Skating events and facilities <br />Project Capability 2 Claim: <br />Value oriented to design a padding system that has a high level of safety while also keeping costs lower <br />in areas where athlete protection is not as critical <br />Documented Performance: <br />Previous speed skating system planning <br />Project Capability 3 Claim: <br />Cash Flow and Disbursements - half of quoted price due upon PO issuance, balance due upon delivery <br />and installation of padding system. <br />Documented Performance: <br />Project Capability 4 Claim: <br />Documented Performance: <br />Project Capability 5 Claim: <br />Documented Performance: <br />Page 31of 38 <br /> <br />