Laserfiche WebLink
ATTACHMENT G <br />VALUE ADDED PLAN <br />Identify any options, ideas, alternatives, or suggestions to add value to this project. Include a short <br />description of how it adds value to the project and identify if the items will increase or decrease schedule, <br />cost, or satisfaction. All cost and schedule impacts associated with these value added options must NOT <br />be included in your base cost/schedule. You mayadd/delete additional rows if necessary but do not exceed <br />the2-pagelimit. <br />Additional sections above planned areas could have reduced foam padding <br />to reduce overall cost of system. <br />Item 1 Claim: <br />How will this add value? <br />Overall cost reduction <br />Documented <br />This would alter the protection of the athletes but could save in overall costs <br />Performance: <br />Savings of 7% is when all pads are at lowest protection level. <br />1% to 7% decrease <br />Cost Impact (%):Schedule Impact (%) <br />0% anticipated <br />Increasing the amount of Poles installed around the oval pad system <br />Item 2 Claim: <br />How will this add value? <br />Added stability of pads during windy outdoor conditions <br />Documented <br />Pole locations are minimized to allow for best protection but may not hold pads in place <br />properly in windy conditions <br />Performance: <br />Cost Impact (%):Schedule Impact (%) <br />1-1.5% increase <br />0% effect on delivery <br />minimal increase on <br />installation time <br />Item 3 Claim: <br />How will this add value? <br />Documented <br />Performance: <br />Cost Impact (%):Schedule Impact (%) <br />Item 4 Claim: <br />How will this add value? <br />Documented <br />Performance: <br />Cost Impact (%):Schedule Impact (%) <br />Item 5 Claim: <br />How will this add value? <br />Documented <br />Performance: <br />Cost Impact (%):Schedule Impact (%) <br />Page 32of 38 <br /> <br />