My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0927_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0927_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2022 2:25:06 PM
Creation date
9/28/2022 2:22:09 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/27/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the trash annually from going to the Recycling and Energy Center. Staff are hoping for another <br />successful Zero Waste event. <br />Major Maintenance Activities: <br />• Street and Storm <br />o Ongoing street patching. <br />o Completed spray patching delamination areas. <br />o Streetscape fall cut backs started. <br />o Ongoing catch basin repairs. <br />o Ongoing sign work repairs and change outs. <br />o Fall of 2021's finished compost pushed to pile. Ready for 10/3/22 Leaf Recycling <br />Center opening date. <br />o Responded misc tree calls for fallen tree branches. <br />o Wildlife Rehabilitation/Harriet Alexander Nature Center parking lot and pathway <br />prepped & removal for pave. Then dirt, seed restoration and parking lot painting <br />completed. <br />o Completed third city-wide sweep before MN State Fair. <br />o Posted, then removed, temporary no parking signs in neighborhoods around State Fair <br />Park and Rides. <br />Water and Sanitary Sewer <br />o Located City -owned facilities for Gopher State One Call locate requests. <br />o Made weekly site visits to all lift stations. <br />o Repaired two broken water mains. <br />o Continued repairing water meters and MIUs. <br />o Worked with IT to restore communications on SCADA at the Booster Station. <br />o Continued working with contractor and electrician on motor issues at the St. Croix <br />storm water lift station. (Filters are in. Working on setting a date for install.) <br />o Collected water samples for bacteriological and disinfection byproducts. <br />o Continued working with AE2S on the 2021 SCADA System Upgrades. <br />o Continued laundering towels weekly used by office personnel for cleaning work areas. <br />o In progress the 2022 sanitary sewer cleaning program. <br />o Started locating stop boxes along County Road B for the water main project. <br />o Cleaned lift stations. <br />o Water tower tank mixer installed. <br />Attachments <br />A: 2022 Roseville Project Map <br />B: September Development Activity Report <br />C: Sustainable Roseville August Update <br />
The URL can be used to link to this page
Your browser does not support the video tag.