My WebLink
|
Help
|
About
|
Sign Out
Home
2022-10-25_PWETC_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Minutes
>
202x
>
2022
>
2022-10-25_PWETC_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:31:24 AM
Creation date
1/26/2023 9:31:12 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nays: 0 <br />Abstain: 1 (Hodder) <br />Motion carried. <br />5. Communication Items <br />Interim Public Works Director/City Engineer Jesse Freihammer provided a brief <br />review and update on projects and maintenance activities listed in the staff report <br />dated October 25, 2022. <br />Member Hodder asked about County Road B, one half of the road has the gas line <br />and he wondered what is going to happen to the other half of the road. <br />Mr. Freihammer explained as a part of the project the County replaced all of the <br />concrete and put it back as asphalt so it looks different. The original plan was that <br />next summer the County was going to finish the reconstruct and convert all of the <br />asphalt but that project has been delayed one year and will look exactly as it is until <br />2024. hi 2024, the project will get a reconstruct where the concrete will be replaced <br />from Snelling to Lexington where it will match into the asphalt. The asphalt that <br />was put in this year the County will do a mill and overlay to blend into that. The <br />City will be doing a watermain project as a part of that project between Dellwood <br />and Merrill, which will be on the North side of the road. Between Snelling and <br />Hamline the City will also be doing the watermain. <br />Member Collins inquired regarding County Road B, at Dale and County Road B <br />the County replaced the intersection in 2021 and put it back at a different pitch <br />change in all the ADA area and he wondered if that will be addressed as well. <br />Mr. Freihammer indicated he will have to look at the plans but did not think the <br />County will be going to the intersection. He thought it was planned to go to just <br />short of the intersection. Dale street is up for a mill and overlay in 2024 and that <br />will go from Como to Hwy 36. He noted the City has heard about that issue. <br />Chair Ficek indicated he had a question on the Neel project that is finishing up. He <br />asked if this was through the County because it is mostly on County roads. He <br />wondered if Neel had to get permitted by the County. <br />Mr. Freihammer indicated that is correct. Both the City and County signed off on <br />the permits. It was mainly working through the County. The original plan was to <br />go down a City road but the City pushed it back on the County and did not want to <br />have that going through a couple of residential neighborhoods that had also been <br />recently redone. <br />Chair Ficek thought in feedback to the County, their traffic control left a lot to be <br />desired. Also, the sidewalks at times were blocked on both sides and a lot of kids <br />use those going to and from the high school. <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.