My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0524_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0524_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:02 AM
Creation date
1/26/2023 9:44:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey County Updates: <br />• County Road B2 Resurfacing and Signal Improvements <br />o Work on the three signals east of Fairview Avenue is completed and all signals are <br />operational and the pavement work between Snelling Avenue and Hamline Avenue is <br />completed. Work on the signal at the Fairview Avenue and County Road B2 <br />intersection should be completed by the end of the week. Resurfacing the pavement <br />between Fairview Avenue and Snelling Avenue will take place the week of May 23. <br />The contractor plans to mill and pave at night to minimize traffic impacts near <br />Rosedale. All work should be completed by June 3. <br />MnDOT Updates: <br />• Snelling Avenue Cable Median <br />o Work began on April 25. MnDOT's contractor is installing a cable median on Snelling <br />Avenue between County Road C and I-694. Lane restrictions will take place between <br />9:00 a.m. and 3:00 p.m. daily for the side the contractor is working. Work will begin <br />for northbound Snelling Avenue through mid -May and then will start on southbound <br />through mid -June. <br />Miscellaneous Updates: <br />• Neel Gas Project <br />o Neel Energy will be completing its Northeast Metro Gas project this summer. The gas <br />main will be replaced on County Road B between Hamline Avenue and Lexington <br />Avenue and on Hamline Avenue between County Road B and County Road C. Work <br />began on Monday April 16. Current work is on Hamline Avenue with the following <br />impacts. <br />• Hamline Avenue, between County Road C and Rose Place. <br />• Shifting lanes, two-way traffic allowed. <br />• Hamline Avenue, between County Road B2 and Commerce Street. <br />• Line installation and material staging. <br />• Shifting lanes, two-way traffic allowed. <br />• Hamline Avenue, between Commerce Street and County Road B. <br />• Line installation and material staging. <br />• One-way southbound only traffic. <br />• County Road B, between Hamline Avenue and Lexington Avenue. <br />• City of Roseville's County Road B Watermain Improvements Project. <br />• One-way westbound only traffic. <br />Council Update: <br />• Below is a highlight of items recently presented to and/or acted on by the City Council. <br />More information can be found in the agenda packets and minutes for the referenced <br />Council meeting. <br />o May 9 <br />• Approved a Request for Proposal for a consultant to conduct a Community - <br />Wide Visioning Process. <br />• Approved a Professional Services Agreement for the South McCarrons <br />Retaining Wall Design. <br />• Approved a Minnesota Department of Transportation Master Partnership <br />Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.