My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0524_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0524_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:02 AM
Creation date
1/26/2023 9:44:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: May 24, 2022 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2022 Sewer Lining <br />o The contract was awarded to Hydro-Klean on December 6, 2021. The project consists <br />of lining 5.6 miles of pipe within the city. Work has begun with about 50% of the work <br />completed within Roseville. Work is anticipated to be completed by the Fall of 2022. <br />• Lexington Watermain <br />o The contract was awarded to SGP Contracting, Inc. on March 7, 2022. The project <br />consists of replacing watermain on Lexington Avenue from the railroad tracks south of <br />County Road C to Woodhill Drive to the north. The majority of the work will be done <br />by pipe bursting the old watermain to limit the excavation along Lexington Avenue. <br />Work is underway and should be completed by mid -June prior to Rosefest. Traffic will <br />be reduced to one lane in each direction by eliminating the center left turn lane for most <br />of the project. <br />County Road B Watermain <br />o This contract was awarded to Northdale Construction on April 11. Work consists of <br />replacing watermain between Merrill Street and Lexington Avenue by open cutting. <br />This project is being done in conjunction with Xcel's Gas Project. Work is underway <br />with watermain installation scheduled for the week of May 23. City watermain work <br />should be done by late June. <br />o Traffic control on the project is in place. Traffic will be reduced to westbound only and <br />will continue until Xcel project is completed in late September. <br />2022 Pavement Management Project <br />o The project was awarded to Bituminous Roadways on April 11. <br />o Work consists of mill and overlaying 9.4 miles of roadways, installation of new <br />pathway on Lexington Avenue north of Woodhill Drive, replacement of retaining wall <br />at County Road C2/Merrill Avenue and other miscellaneous work. <br />o Minimal traffic impacts are anticipated for most of the work. <br />o Work is expected to begin in early June and continue through the summer. <br />Civic Campus Pre -Design Project <br />o The City has hired BKV Group to continue the Civic Campus Master Plan planning and <br />concept design to further develop the concepts for the Maintenance Facility, the License <br />and Passport Center and the VFW in order to better define costs and phasing plans. <br />This project is also helping us as we possibly seek to use Local Sales Tax revenue to <br />fund the actual construction of these facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.