My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0524_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0524_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:02 AM
Creation date
1/26/2023 9:44:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
78.D. ❑X The name(s) of individual(s) or position title(s) responsible for conducting site inspections: <br />Engineering Project Coordinators <br />R.O.W. Coordinator <br />*79. Permit item 19.9: Do you use a written checklist to document each site inspection when determining compliance with your <br />regulatory mechanism(s)? (Note: All or some of this item is a new permit requirement. Compliance with new <br />requirements is required within 12 months after receiving permit coverage.) <br />® Yes <br />❑ No (Skip to Q82) <br />80. If yes in Q79, are the following items incorporated in your written checklist? (Check all that apply) <br />80.A. ❑X Stabilization of exposed soils (including stockpiles) <br />80.B. ❑X Stabilization of ditch and swale bottoms <br />80.C. ❑X Sediment control BMPs on all downgradient perimeters of the project and upgradient of buffer zones <br />80.D. 0 Storm drain inlet protection <br />80.E. ❑X Energy dissipation at pipe outlets <br />80.F. ❑X Vehicle tracking BMPs <br />80.G. ❑X Preservation of a 50 foot natural buffer or redundant sediment controls where stormwater flows to a surface water <br />within 50 feet of disturbed soils <br />80.H. ❑X Owner/operator of construction activity self -inspection records <br />80.1. ❑X Containment for all liquid and solid wastes generated by washout operations (e.g., concrete, stucco, paint, form <br />release oils, curing compounds, and other construction materials) <br />80.J. ❑X BMPs maintained and functional <br />81. Provide any additional information on your process to document site inspections (optional): <br />*82. Permit item 19.10: Do you have written procedures for receipt and consideration of reports of noncompliance or other <br />stormwater related information on construction activity submitted to you by the public? <br />® Yes <br />❑ No (Skip to Q84) <br />83. If yes in Q82, please provide your procedures or a description of your procedures (e.g., how the public may submit <br />concerns, typical timeframe for you to investigate reports): <br />Receive the complaint, document it (either in an email, or our inspection program), inspect the site, follow up with the issuer <br />of the complaint. Follow up as needed. <br />*84. Permit item 19.11: Do individuals receive training commensurate with their responsibilities as they relate to your <br />Construction Site Stormwater Runoff Control program? Individuals includes, but is not limited to, individuals responsible for <br />conducting site plan reviews, site inspections, and/or enforcement. <br />❑X Yes <br />❑ No (Skip to Q87) <br />https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-strm4-49a • 9123120 Page 18 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.