Laserfiche WebLink
85. If yes in Q84, do previously trained individuals attend a refresher -training every three (3) calendar years following <br />the initial training? (Note: All or some of this item is anew permit requirement. Compliance with new requirements <br />is required within 12 months after receiving permit coverage.) <br />® Yes <br />❑ No <br />86. If yes in Q84, what training do your staff who perform site inspections receive? (Check all that apply) <br />86.A. ❑X University of Minnesota Erosion and Stormwater Management Certification Program <br />86.B. ❑ Qualified Compliance Inspector of Stormwater <br />86.C. ❑ Minnesota Laborers Training Center Stormwater Pollution Prevention Plan Installer or Supervisor <br />86.D. ❑ Minnesota Utility Contractors Association Erosion Control Training <br />86.E. ❑ Certified Professional in Erosion and Sediment Control <br />86.F. ❑ Certified Professional in Stormwater Quality <br />86.G. ❑ Certified Erosion Sediment and Storm Water Inspector <br />86.H. ❑ Other (describe below): <br />86.1. <br />*87. Permit item 19.12: Do you maintain written ERPs to compel compliance with your regulatory mechanism(s) in Section 19? <br />(Note: All or some of this item is a new permit requirement. Compliance with new requirements is required within 12 <br />months after receiving permit coverage.) <br />® Yes <br />❑ No (Skip to Q89) <br />88. If yes in Q87, which enforcement tools are included in your ERPs? (Check all that apply) <br />88.A. ❑X Verbal warning <br />88.B. ❑X Notice of violation <br />88.C. 0 Administrative order <br />88.D. 0 Stop work order <br />88.E. ❑X Fine <br />88.F. ❑X Forfeit of security bond money <br />88.G. ❑X Withholding of certificate of occupancy <br />88.H. ❑ Criminal action <br />88.1. ❑ Civil penalty <br />88.J. ❑ Other (describe below): <br />88. K. <br />*89. Please specify name or position title of responsible person(s) for conducting enforcement: <br />Ryan Johnson, Environmental Manager <br />*90. Perm it item 19.13: Do you document each site plan review you conduct? <br />® Yes <br />❑ No (Skip to Q92) <br />91. If yes in Q90, what do you document in your site plan review process? (Check all that apply) <br />91.A. ❑X Project name <br />91.B. 0 Location <br />91.C. ❑X Total acreage to be disturbed <br />91.D. ❑X Owner and operator of the proposed construction activity <br />91.E. ❑X Proof of notification to obtain coverage under the CSW Permit or proof of coverage under the CSW Permit <br />(Note: All or some of this item is a new permit requirement. Compliance with new requirements is required <br />within 12 months after receiving permit coverage.) <br />91.F. ❑X Any stormwater related comments and supporting completed checklist, to determine project approval or denial <br />(Note: All or some of this item is a new permit requirement. Compliance with new requirements is required <br />within 12 months after receiving permit coverage.) <br />https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-strm4-49a • 9123120 Page 19 of 32 <br />