Engagement Ao *irc#ich <br />Engagement is an important component to the Dale Street project. Engagement on this project will <br />include various public input opportunities including open houses, surveys and conversations with the <br />project team. <br />The first phase of the project will begin with a project introduction where <br />project team will present existing conditions along the corridor and gath <br />that will influence conceptual design. <br />Engagement <br />Goal: <br />the <br />er input <br />Introduce the public to the project and learn about the <br />community's desires for pedestrian and bicycle improvements. <br />During the second phase of the project, the project team will present a refined <br />conceptual design and will seek further input from the public before advancing <br />the concept to detailed engineering and design, at which point it is very unlikely <br />significant changes will be made to concept. <br />Engagement Share the preliminary design with the public and learn about <br />Goal: desired refinements. <br />The third phase of the project is where the project team will present the final <br />project concept and will inform community of next steps regarding construction <br />and periodic project updates. <br />11ifFEngagement Share the final design and introduce the construction process. <br />Goal: <br />Engagement <br />INFORM <br />Provide information to assist in the understand <br />of the issues, alternatives and solutions. <br />COMMUNITYKeep the community informed of project <br />COMMITMENT:progress and updates. <br />CONSULT <br />FE) INFORM <br />Introduction to project <br />Introduction to the community <br />Winter 2022/2023 <br />MR <br />CONSULT <br />Gather feedback on analysis, alternatives and <br />decisions. <br />J <br />Keep the community informed, listen to and <br />recognize concerns, and provide information on <br />how feedback is used. <br />Conceptual Design <br />Share concepts & gather input <br />Spring/Summer 2023 <br />Detailed Engineering & Construction <br />Share final concept <br />0�0 <br />Winter 2023/2024 <br />DALE STREET SAFETY CONVERSION <br />1R AMwE k COUNTY <br />