My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 02132023
Roseville
>
City Council
>
City Council Meeting Packets
>
2023
>
CCP 02132023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2023 2:29:18 PM
Creation date
3/3/2023 2:28:40 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
2/13/2023
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A2:CIP Project/Initiative summary (if applicable) <br />Attachment A-1 <br />General Purchases or Contracts <br />BudgetP.O.Budget / <br />DivisionVendorDescriptionKeyAmountAmountCIP <br />Parks & Recreation (Improvements)Flagship RecreationPlayground Replacement - Keya Park (Design, Equipment for Com. Build)(a)$180,000$155,0002023 CIP <br />Parks & Recreation (Improvements)Flagship RecreationPlayground Replacement - Keya Park (Theming and ADA Enhancements)(b)$180,000$25,0002023 CIP <br />Public WorksStykemain Commercial Trucks & EquipmentCrane Truck Replacement - 2022 Chevrolet Silverado MD 5500(c)$185,000$161,4652023 CIP <br />Public WorksJackson & Associates LLCRoof Repairs at City Hall and Maintenance Facility(d)$62,500$27,8052023 Budget <br />Public WorksPovolny SpecialtiesBattery Backup for Street Signals(e)$13,900$13,900MSA Dollars <br />Public Works <br />Key <br />Keya Park has outlived its useful life and is showing significant signs of deterioration. Flagship Recreation is the vendor we <br />(a)would like to bring on to help design and provide the equipment for a full community engagement process to finish building <br />the playground. <br />(b)These budgeted funds are planned for Keya (turtle) themed elements and possible interpretive items in and around the park. <br />In the 2023 budget the city planned to replace the current 1986 F-350 crane truck #209 which is used to service lift stations. <br />It is currently in need of upgrades due to its age and condition. The current crane also has a limited capacity and can not <br />service all of our existing pumps. Because the cost of a new crane truck is more than what was originally budgeted, it has <br />(c) <br />been decided to delay the I&I reduction to another year and would use this portion of the budget to offset the increase cost of <br />the vehicle replacement. It is also the intention to dispose of the current 1986 crane truck at auction and expect to receive at <br />least $10,000. <br />During inspections it was found that work is required in the City Hall roof and Maintenance Facility roof to fix leaks and <br />(d)extend the life of the roofs. The City received a quote from the vendor who did the work last year. Maintenance includes <br />repairs to five locations ans should extend the life of the roof for another 5-10 years before additional maintenance is needed. <br />In response to safety concerns during power outages, City staff has worked with MnDOT to install battery backup systems at <br />(e)the Snelling Ave and County Road C2 signal and at the Snelling Ave and Lydia signal. The full amount of $13,900 will be <br />covered by Minnesota State Aid dollars. <br />Sale of Surplus Vehicles or Equipment <br />Est. Sale / <br />Trade-In <br />DivisionDescriptionKeyAmount <br />Public WorksDispose of Existing Crane Truck(c)$10,000 <br />29 <br />Page2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.