Laserfiche WebLink
CHARGING LEVELS: standardized indicators of electrical force, or voltage, at which an electric 24 <br />vehicle’s battery is recharged. The terms 1, 2, and DC are the most common charging levels, and include 25 <br />the following specifications: 26 <br />1. Level 1 is considered slow charging with 120v outlets. 27 <br />2. Level 2 is considered medium charging with 240v outlets, charging head and cord hard-wired to 28 <br />the circuit. 29 <br />3. DC is considered fast or rapid charging. Voltage is greater than 240. 30 <br />ELECTRIC VEHICLE: a vehicle that operates, either partially or exclusively, on electrical energy from 31 <br />the electrical grid, or an off-grid source, that is stored on board for motive purposes. “Electric vehicle” 32 <br />includes: 33 <br />1. Battery electric vehicle 34 <br />2. Plug-in hybrid electric vehicle 35 <br />ELECTRIC VEHICLE CHARGING STATION (EVCS): a public or private parking space that is served 36 <br />by battery charging station equipment that has as its primary purpose the transfer of electric energy (by 37 <br />conductive or inductive means) to a battery or other energy storage device in an electric vehicle. 38 <br />ELECTRIC VEHICLE CHARGING INFRASTRUCTURE: conduit/wiring, structures, machinery, and 39 <br />equipment necessary and integral to support an electric vehicle, including battery charging stations and 40 <br />rapid charging stations. 41 <br />ELECTRIC VEHICLE PARKING SPACE: any marked parking space that identifies the use to be 42 <br />exclusively for the parking of an electric vehicle. 43 <br />ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE): any equipment or electrical component used in 44 <br />charging electric vehicles at a specific location. EVSE does not include equipment located on the electric 45 <br />vehicles themselves. 46 <br />ELECTRICAL CAPACITY shall mean, at minimum: 47 <br />1. Panel capacity to accommodate a dedicated branch circuit and service capacity to install a 48 <br />208/240V outlet per charger; 49 <br />2. Conduit from an electric panel to future EVCS location(s). 50 <br />LOT WIDTH: The horizontal distance between the side lines of a lot measured at right angles to its depth 51 <br />along a straight line parallel to the front lot line at the minimum required structure setback line.The 52 <br />minimum distance between: 53 <br />1. Side lot lines measured at the midpoint of the building line; and 54 <br />RCA Attachment A <br />Page 2 of 32