Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br /> Date: June 20, 2023 <br /> Item No.: 7.d <br />Department Approval City Manager Approval <br />Item Description: Victoria Street Pathway Funding Update <br />Page 1 of 3 <br />BACKGROUND 1 <br />On March 20, 2023, the City Council approved a resolution requesting Ramsey County to submit for 2 <br />federal region solicitation funds for the Victoria Street Pathway and committing the City of 3 <br />Roseville to its local cost share. On June 5, 2023, the Shoreview Council passed a similar resolution 4 <br />of support. The application would be submitted this summer for the West Alternative as detailed in 5 <br />the Victoria Street Roadway and Trail Conceptual Design Study (Attachment B). 6 <br />After the March 20 meeting, the County informed the City they may apply for a different funding 7 <br />category in the Metropolitan Council Regional Solicitation. They think applying to the Safe Routes 8 <br />to School category will have a better chance of being funded than the Regional Trail category. 9 <br />There are three elementary schools adjacent to the corridor which makes this application very strong. 10 <br />Additionally, there are typically less applications in this category than the regional trail category. 11 <br />Although there is a better chance of getting federal funds to help pay for the project, the maximum 12 <br />award amount for the Safe Routes to School category is $1,000,000. If this is awarded, funding 13 <br />breakdown would be as shown below. Roseville’s estimated cost would go from $240,000 up to 14 <br />$900,000. 15 <br />Total Cost (2028 dollars)4,000,000.00$ Total Cost (2028 dollars)4,000,000.00$ <br />Maximum SRTS Award 1,000,000.00$ Maximum Award (80%)3,200,000.00$ <br />Remaining Costs 3,000,000.00$ Remaining Costs 800,000.00$ <br />Ramsey County 50% Share 1,500,000.00$ Ramsey County 50% Share 400,000.00$ <br />Estimated City 50% Share 1,500,000.00$ Estimated City 50% Share 400,000.00$ <br />City of Roseville Share 60%900,000.00$ City of Roseville Share 60%240,000.00$ <br />City of Shoreview Share 40%600,000.00$ City of Shoreview Share 40%160,000.00$ <br />Safe Routes To School Regional Trail <br /> 16 <br />Below is additional background information from the March 20, 2023 staff report: 17 <br />In 2021, Ramsey County began studying how a pathway on Victoria Street could be installed 18 <br />between County Road C in Roseville up to Harriet Avenue in Shoreview (Attachment B). In 19 <br />August of 2022, the Victoria Street Roadway and Trail Conceptual Design Study was 20 <br />completed. 21 <br />This 2- mile segment along Victoria Street is currently posted between 35-40 mph and only 22 <br />has a small shoulder that can be used for walking and biking. The road has an average of 23 <br />4,950-6,200 vehicles per day of traffic and also serves Metro Transit Route 227. There are 24 <br />no separated sidewalks or trails in this segment, except for a sidewalk segment built a few 25