My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 07102023
Roseville
>
City Council
>
City Council Meeting Packets
>
2023
>
CCP 07102023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 4:17:04 PM
Creation date
7/14/2023 4:15:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
7/10/2023
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />Public Works Department <br />Memo <br />To:Michelle Pietrick, Finance Director <br />From: Ryan Johnson, Environmental Manager <br />CC: Jesse Freihammer, Public Works Director <br />Date: 7/5/2023 <br />Re: Willow Pond Outlet Maintenance <br />Staff is requesting authorization to approve a contract with Meyer Contracting, Inc.for maintenance of <br />the Willow Pond Outlet. <br />Willow Pond has a large outlet structure that controls the elevation of the pond. This outlet was <br />constructed in 1965 and needs periodic maintenance to maintain the functionality of the structure. This <br />year the iron that holds up a catwalk, and other iron that holds up stop logs needs to be replaced and <br />repainted. Overall the concrete portion of the outlet is in good condition and will only need minor skim <br />coating to patch a few issue areas. <br />Staff requested a quote from five vendors for our Willow Pond Outlet Maintenance and two quotes were <br />submitted: <br />Contractor Quote Total <br />Meyer Contracting, Inc. $59,743.40 <br />Bituminous Roadways $88,540.00 <br />Even though there were only two quotes for service, staff feels the cost is appropriate based on other <br />projects with similar scopes. <br />Staff recommends that the Council approve the quote of $59,743.40 for the Willow Pond Outlet <br />Maintenance to be paid from contract services in the Storm Water Fund. <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.