My WebLink
|
Help
|
About
|
Sign Out
Home
2023_0822_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2023
>
2023_0822_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 8:23:06 AM
Creation date
10/6/2023 8:21:43 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/22/2023
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />lei <br />Public Works Department <br />Memo <br />To: Public Works Environmental and Transportation Commission Members <br />From: Jennifer Lowry, City Engineer <br />Date: August 22, 2023 <br />Re: Communications Items <br />The following are updates to projects and other activities happening in Roseville since <br />the last commission meeting: <br />Roseville Public Works Project updates: <br />• Villa Storm Water Improvements <br />o Contractor making corrections to weir structure. <br />• 2023 PMP <br />o Construction began July 24. Concrete repair and minor utility repairs <br />continue. Milling and paving scheduled throughout September. <br />• Long Lake Lift Station <br />o Awaiting schedule from Pember Companies. <br />• McCarron's Retaining Wall <br />o Plan to rebid late 2023. Utility relocation complete. <br />• 2023 Pathways (Marion St., Lexington Ave. and Cleveland Ave.) <br />o August to mid -September: Marion St. Pathway and Street Construction <br />o September to mid -October: Lexington Ave. Retaining Wall and Pathway <br />o End of September to mid -October: Cleveland Ave. Retaining Wall and <br />Pathway <br />• 2023 Drainage Improvements <br />o Construction is anticipated to begin early September and wrap up mid - <br />October. <br />Other Agency Project Updates: <br />• TH 36 Ramps on Fairview Avenue (MnDOT) <br />o Signal, curb, and trail work are underway. Project should be complete by <br />the State Fair. <br />Old Highway 8 (Ramsey County) <br />o From CR D, north into New Brighton. Roseville impacts will be minimal <br />and occur when the signal at CR D is replaced. <br />o Construction began mid -May and is anticipated through end of October. <br />CSAH 93 / 37"' Avenue (Hennepin County) <br />o Replacement of pedestrian ramps at CR D and Highcrest Road. <br />o Mill and overlay of 371h Ave scheduled September 11-13. <br />Page 8 of 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.