Laserfiche WebLink
• Completed pathway reclamation and paving Lexington Park. <br />• Completed fall cutbacks on County Road C (Oxford Street to 35W) and along Twin <br />Lakes Parkway. <br />• Completed irrigation winterization. <br />• 425 cy clean sand hauled into Public Works yard from Concordia Meadows for reuse. <br />• 45+ storm sewer sumps cleaned out following rain events. <br />• Ongoing storm sewer maintenance, sign work, and asphalt patching for streets and <br />pathways. <br />Water and Sanitary Sewer <br />• Continue to work with owners of private hydrants that are in need of repairs. <br />• SCADA PLC replacement is nearing completion. <br />• Adjusted SCADA radio antenna's for better signals. <br />• Continued jetting, underground locates, weekly lift station inspections, collection of <br />water samples, and replacing water meters and MIUs. <br />• Page 3 <br />Page 13 of 82 <br />