My WebLink
|
Help
|
About
|
Sign Out
Home
2023_1024_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2023
>
2023_1024_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 8:28:27 AM
Creation date
10/26/2023 8:21:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/24/2023
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Completed pathway reclamation and paving Lexington Park. <br />• Completed fall cutbacks on County Road C (Oxford Street to 35W) and along Twin <br />Lakes Parkway. <br />• Completed irrigation winterization. <br />• 425 cy clean sand hauled into Public Works yard from Concordia Meadows for reuse. <br />• 45+ storm sewer sumps cleaned out following rain events. <br />• Ongoing storm sewer maintenance, sign work, and asphalt patching for streets and <br />pathways. <br />Water and Sanitary Sewer <br />• Continue to work with owners of private hydrants that are in need of repairs. <br />• SCADA PLC replacement is nearing completion. <br />• Adjusted SCADA radio antenna's for better signals. <br />• Continued jetting, underground locates, weekly lift station inspections, collection of <br />water samples, and replacing water meters and MIUs. <br />• Page 3 <br />Page 13 of 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.