Laserfiche WebLink
• Ongoing storm sewer maintenance, sign work, and asphalt patching for streets and <br />pathways. <br />Water and Sanitary Sewer <br />• Continue to work with owners of private hydrants that are in need of repairs. <br />• SCADA PLC replacement is complete. <br />• Repaired three watermain breaks. <br />• Completed jetting for 2022 and 2023 locations. <br />• Continued underground locates, weekly lift station inspections, collection of water <br />samples, and replacing water meters and MIUs. <br />• Page 3 <br />Page 11 of 348 <br />