Laserfiche WebLink
Each piece of equipment on public property must have a Universal Spill Kit or other appropriate <br />spill kit. <br />2.12 Missed & Partial Dump Collection Policy & Procedures <br />Contractor shall have a duty to pick up missed and partially dumped collections. Contractor <br />agrees to pick up all missed and partially dumped collections on the same day that the Contractor <br />receives notice of a missed collection or Partial Dump, provided notice is received by the <br />Contractor before 11 a.m. on a business day. If notice of a missed or partially dumped collection <br />is received after 11 a.m. on a business day, the Contractor agrees to pick up that missed or <br />partially dumped collection before 6 p.m. on the business day immediately following. <br />2.13 Severe Weather <br />Recycling collections may be postponed due to severe weather upon mutual agreement between <br />the contractor and the Public Works Director. If a decision to postpone is outside of normal <br />operational hours, contractor will attempt to reach the Public Works Director by phone and <br />email. If a response is not received, and due to safety a decision needs to be made, the contractor <br />will postpone collections. <br />"Severe Weather" shall include but shall not be limited to those cases where the temperature at 6 <br />a.m. is minus 20 degrees Fahrenheit ('F) or colder. Upon postponement, Collector shall notify <br />the City within two hours, put notice on the Contractor's website, alert the news media, and use <br />other means to contact residents. The City will be responsible for notifying the residents by <br />municipal cable TV, email notification, and any other means identified by the City. Collection <br />will be made the following business day. <br />2.14 Weighing of Loads <br />Contractor will keep accurate records consisting of the date, time, collection route, driver's <br />identification, vehicle number, tare weight, gross weight, net weight, and number of recycling <br />stops for each loaded vehicle. Collection vehicles will be weighed empty before collection to <br />obtain a tare weight and weighed after completion of a route or at the end of the day, whichever <br />occurs first. These records shall be maintained on file by the Contractor for at least three years in <br />the event of an audit by the City or County. <br />2.15 Ownership <br />Ownership of the Recyclables shall remain with the person placing them for collection until <br />Contractor's personnel physically touches the Recyclables for collection, at which time <br />ownership shall transfer to the Contractor. <br />2.16 Scavenging Prohibited <br />Any person or persons taking recyclable materials from a recycling container without explicit <br />permission of the inhabitant of a SUD or the owner or manager of a multi -unit dwelling complex <br />will be in violation of local ordinance (City Code 403.03) and subject to penalty. The Contractor <br />Recycling Services Contract 2022-2025.doc • A-13 <br />Page 51 of 348 <br />