My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0123_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0123_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2024 10:40:01 AM
Creation date
1/25/2024 10:38:45 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/23/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Draft <br />December 18, 2003 <br />Page 3 of 4 <br />B. Procedure <br />When a request for an "Enhanced Street Lighting" project is received, City staff, working <br />with property owners, will determine the boundaries of the project. Requests for street <br />lighting can be initiated through a petition process that includes signatures representing at <br />least 60% of the property in the project area. <br />Petition Process <br />• Upon receipt of a petition signed by the owners of sixty percent (60%) of the property <br />area within the proposed project limits, City staff will prepare a preliminary report <br />detailing the streetlight types, location, costs, and proposed assessments. <br />• The City Council will be asked to call and hold a public hearing pursuant to <br />Minnesota Statutes, Section 429.031. <br />• If the project goes to the public hearing, but is not ordered forward, subsequent <br />petitions will not be undertaken for the same project area or any part of the project <br />area for a two (2) year period beginning on the hearing date. The exception to this <br />requirement would be if the City initiates a street reconstruction project in the area. <br />C. Funding <br />The additional costs of an "Enhanced street lighting" project shall be assessed to the <br />benefiting property owners according to City Assessment Policy. All properties within <br />150 feet (Street frontage) of each light shall be considered for assessment. City staff shall <br />determine the number and locations of lights that could have been installed under the <br />"Standard Street Light" section of this policy. The maintenance cost for these lights will <br />be deducted from the overall project cost. <br />A summary of the assessable cost shall be as follows: <br />Cost of installation of enhanced streetlights <br />plus Cost of Operation, Maintenance (pro -rated for 25 years) <br />plus Administrative costs <br />minus "Standard Street Light" maintenance cost (if applicable) <br />=total assessable cost. <br />Xcel energy provides a 25 year warranty for lights that they install. This is included in <br />the City's monthly charge. At the end of this period the City will evaluate the <br />maintenance needs for the "enhanced" areas. A reconstruction project will be considered <br />where the new operation and maintenance costs for the next 25 years will be proposed to <br />be assessed to the benefiting properties. <br />Page 57 of 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.