Laserfiche WebLink
Mk;H0RANDUM <br />DATE: March 29, 1990 <br />TO: Steve Sarkozy <br />FROM: Howard Dahlgren <br />SUBJECT: PLANNING OFFICE HOURS, March 21, 1990 <br />to Nelson (484-9027) <br />Bob Nelson is an architect who operates out of his home at 2589 <br />Fisk in Roseville, and he was in to review a proposed site plan <br />for an old gas station site at the southwest corner of South <br />Owasso and Rice Street. The site is now used as a muffler shop, <br />and the owner proposes to expand the building to more than twice <br />its original size. The problem here is the proposed expansion <br />plan as drawn projects the building northward making it <br />impossible to replan the parking area so as to conform to the <br />required 15 foot setbacks. The existing parking on this site (a <br />corner site) is right up to the right-of-way line, both to the <br />north and the east. We showed Mr. Nelson how the building could <br />be expanded by building it to the west and south, thereby leaving <br />adequate space for 22 parking spaces with no variances required. <br />for the building or the parking. We suggested that if the site <br />care in fact be developed in this way without variances, it may <br />well be very difficult to purposely expand the building so that <br />variances are required. He is going to discuss these options <br />with his client. <br />2. Gregory (332-5544) <br />Arnie Gregory of the Can -American organization, developer of the <br />Reiling property north of City Hall, was in with Tom Hurley, who <br />has an organization called Preferred Properties. He is the <br />proposed developer for the small retail center at the southeast <br />corner of the Can -Am site. Jack Boxell, architect, was also <br />there with the building and preliminary site plans for the <br />development. We reviewed with these gentlemen, the points we <br />discussed last week with staff regarding the proposed <br />development. These points and their proposed disposition are as <br />follows: <br />1. They agreed to install the parking in the northeast <br />corner of the site, assuming the future addition of the <br />additional 5,000 sq. feet on the north end of the <br />building. This will eliminate the need to tear up the <br />curbing and rebuild it at a later point in time. We <br />noted that we have no authority to authorize a staging <br />of this development, but if the parking lot were built <br />in its entirety, the last phase of the structure could <br />(( be added later. <br />