Laserfiche WebLink
CASE NUMBER: 1480-83 Page 4 <br />APPLICANT: <br />American Redevelopers, Inc, <br />pond on approximately an acre of land <br />staff <br />City to construct a storm water engineering <br />contiguous to the property at its northwest corner. The finds that the <br />plan with respect to this concept, has reviewed the site p ro osed drainage solution. <br />plan is workable and consistent with tasldiscussed with the developers is <br />Here again, the appropriate procedurepublic improvement project, <br />for them to petition the City foWlilstorm <br />donetto determine the precise <br />er after which a feasibility study solution and costs. In any event, the concept is to provide for a required <br />onding facilities off the site as an ingredient of the Tax Increment <br />interim p Development Plan already in place. <br />TAX INCREMENT IMPLICATIONS <br />13. Included with the information submitted by <br />the developers, is an estimate <br />the Ramsey County Assessor's office of a pssedct value v luationfwould5be,000. <br />from the as - <br />if this is an Assessor's Market Valuer <br />approximately $4,410,000. The valuation estimated for this site in the <br />a <br />pp <br />ax <br />nt <br />Tax <br />Increment Program was $21973,814. Thus, hstatemeactual nttindicatesewill <br />be substantially larger than estimated. Their <br />is <br />increment (difference between the old taxes and ewtaxes) <br />benefit of thelmore to <br />be $352,422 per year. This illustrates the incipal structure and that of <br />intensive three level development of the P from a Tax Increment Plan stand - <br />the two level parking ramp proposed. Thus, <br />point, the proposed development constitutes fimprovement1Progr� <br />City toward the accomplishment othe <br />poif its Tax Increment <br />NEIGHBORHOOD IMPLICATIONS <br />a- The developers have met with the neighbors in two separate dates as <br />14. ovember and 1 December. <br />Of <br />lts <br />recommended by the staff, on 29 Nion packetuattached <br />these meetings are included in the developer <br />100 feet of the property is <br />to this report. As you know, the easterly and the northerly 40 feet <br />retained for landscape and screening purposes, <br />also retained for that function. The Shopping Center District requires <br />is a and contiguous <br />that there be a 40 foot buffer strip between the parking the generalized <br />residential properties. Sections have been drawn a d°fencing proposed. <br />grade differential, and impact of the screening The final surface solution, however, may be dependent to some degree on <br />the ultimate drainage details. Thus, it may be appropriate for the <br />Planning <br />Commission and Council to consider final approval of the landscaping <br />and screening plans subjvement <br />ect to staff review and neighborhood <br />dinvolsppear <br />following completion of the drainage <br />feionroflthety srequired screening <br />that the purpose, intent, <br />facilities can be accomplished within the plan asproposed. <br />