CASE NUMBER: 1480-83 <br />APPLICANT: American Redevelopers, Inc. Page 3 <br />8. The Roseville Ordinance also allows for up to 50 percent of the parking to <br />be designated as compact spaces. This concept is not being utilized in this <br />development, inasmuch as all spaces are designed,for the normal nine foot <br />width utilized at Rosedale and most other retail facilities in Roseville. <br />We mention this only inasmuch as if the parking proves to be inadequate, a <br />restriping of portions of the lot and ramp could produce substantially <br />additional parking if needed. Your engineering staff has reviewed the <br />parking combinations and design, confirming their adequacy. <br />PUBLIC STREET ACCESS <br />9. As you know, southwesterly of the proposed structure there exists a savings <br />and loan office and a retail building to the west. When those developments <br />were approved, a 30 foot public street easement was obtained along the east <br />and north sides of these properties. That was done with the intention of <br />ultimately having a full width public street at this location, providing <br />access to the property in question, connecting directly to the entrance to <br />Rosedale and the opening of the median strip with County Road B-2 at that <br />point. The current proposal includes a dedication of an additional 30 feet <br />to complete this public street system. The drawings indicate a dedication <br />of 29 feet on the north -south leg, and we do not know why that is designated <br />29 feet rather than the customary 30 feet. In any case, that would appear <br />to be no problem. You will notice too that on that leg of the public street <br />system, that a public sidewalk is proposed beyond the right-of-way. This <br />can be handled by extending a sidewalk easement to cover the additional width. <br />10. The developers have been informed that the appropriate procedure with respect <br />to this street is for them to petition for a public improvement project, <br />which would result in the conduct of a feasibility study on the part of the <br />engineering department for the construction of this full width public <br />roadway. Pending appropriate hearings and decision by the Council, this <br />street could then be constructed with necessary utilities and assessed to <br />the properties benefited. It is likely in this case, that the benefitted <br />properties already in place, would be assessed less inasmuch as they have <br />already constructed a street facility on the public easement they have <br />already dedicated. <br />11. With respect to the proposed access to the site, and the access analysis <br />conducted by the traffic consultant, the engineering staff has reviewed the <br />proposals and recommend that the proposed solution is appropriate and <br />workable. <br />DRAINAGE <br />12. This site is included in the City's current Tax Increment District. A <br />benefit proposed to this property under the Tax Increment Plan is for the <br />