|
the Architect for any damage resulting from any such
<br />errors, inconsistencies or omissions in the Contract Docu-
<br />ments. The Contractor shall perform no portion of the
<br />Work at any time without Contract Documents or, where
<br />required, approved Shop Drawings, Product Data or
<br />Samples for such portion of the Work.
<br />4.3 SUPERVISION AND CONSTRUCTION PROCEDURES
<br />4.3.1 The Contractor shall supervise and direct the Work,
<br />using his best skill and attention. He shall be solely re-
<br />sponsible for all construction means, methods, tech-
<br />niques, sequences and procedures and for coordinating
<br />all portions of the Work under the Contract.
<br />4.3.2 The Contractor shall be responsible to the Owner
<br />for the acts and omissions of his employees, Subcontrac-
<br />tors and their agents and employees, and other persons
<br />performing any of the Work under a contract with the
<br />Contractor.
<br />4.3.3 The Contractor shall not be relieved from his obli-
<br />gations to perform the Work in accordance with the
<br />Contract Documents either by the activities or duties of
<br />the Architect in his administration of the Contract, or by
<br />inspections, tests or approvals required or performed un-
<br />der Paragraph 7.7 by persons other than the Contractor,
<br />+.4 LABOR AND MATERIALS
<br />4.4.1 Unless otherwise provided in the Contract Docu-
<br />ments, the Contractor shall provide and pay for all labor,
<br />materials, equipment, tools. construction equipment and
<br />machlner, , water, hea,, utilities, transportation, and ether
<br />famtities and services necessary for the proper execution
<br />and completion of the `fork, whether temporary, or per.
<br />manent and whether or not incorporated or to be incor-
<br />Porated in the Work.
<br />4.4.2 The Contractor shall at all times enforce, strict dis-
<br />cipline and good order among his employees and shall not
<br />employ on the Work any unfit person or anyone not
<br />skilled In the task assigned to him.
<br />4.S WARRANTY
<br />4.5.1 The Contractor wjtrants to the Owner and the
<br />,Architect that all materials and equipment furnished
<br />under this Contract will be new unless otherwise sped.
<br />tied, and that all work will be of good quality, free irom
<br />faults and defects and in conformance with the Cowfact
<br />Documents, All Work not eonformong to these require•
<br />ments. including substitutions not properly appro, ed and
<br />authorized, ma+ be conetdered defective. If required by
<br />the Architect. the Contractor shall furnish satisfactory evi.
<br />dence as to the kind and quality Of materials and equip-
<br />ment. This warranty is not limited by the provisions of
<br />Paragraph 13.2,
<br />4.6 TAXES
<br />4.6.1 The Contractor shall pay all sales. consumer, use
<br />and other similar taxes for the Work or portions thereof
<br />Provided by the Contractor which are legally enacted at
<br />the time bids are received. whether or not yet effective.
<br />4.7 PERMITS, FEES AND NOTICES
<br />4.7.1 Unless otherwise provided in the Contract Docu.
<br />ments. the Contractor shall secure and pay for the build.
<br />ing permit and for all other permits and governmental
<br />fees, licenses and inspections necessary for the proper
<br />execution and completion of the Work which are custom-
<br />arily secured after execution of the Contract and which
<br />are legally required at the time the bids are received.
<br />4.7.2 The Contractor shall give all notices and comply
<br />with all laws, ordinances, rules, regulations and lawful or-
<br />ders of any public authority bearing on the performance
<br />of the Work.
<br />4.7.3 It is not the responsibility of the Contractor to
<br />make certain that the Contract Documents are in accord-
<br />ance with applicable laws, statutes, building codes and
<br />regulations. If the Contractor observes that any of the
<br />Contract Documents are at variance therewith in any re-
<br />spect, he shall promptly notify the Architect in writing,
<br />and any necessary changes shall be accomplished by ap-
<br />propriate Modification.
<br />4.7.4 If the Contractor performs any Work knowing it to
<br />be contrary to such laws, ordinances, rules and regula•
<br />tions, and without such notice to the Architect, he shall
<br />assume full responsibility therefor and shall bear all costs
<br />attributable thereto.
<br />4.8 ALLOWANCES
<br />4.8.1 The Contractor shall include in the Contract Sum
<br />all allowances stated in the Contract Documents. Items
<br />covered by these allowances shall be supplied for such
<br />amounts and by such persons as the Owner may direct,
<br />but the Contractor will not bin required 10 employ persons
<br />against Whom he makes a reasonable objection.
<br />4.8.2 Unless otherovrse provided to the Contract Docu-
<br />ments
<br />.1 these allowancen shall cover the cost to the Con.
<br />Iractor. leis any applicable . 4de discount. of the
<br />materials and equipment required by the allowance
<br />delivered at the sole, and all applicable taxes:
<br />.2 the Contractor's ec,st lot unloading and handling
<br />on the site. labor, IMIallation costs, overhead, pro( -
<br />of anr} other expenses contemplated for the original
<br />au0zs,ance shall be included in file Contract Sum and
<br />not in the allowance.
<br />.3 whenever the ck)st m more than or less than the
<br />allowance, the Contract Sum $hail be adjusted ac-
<br />cordingly by Change Order the amount of which
<br />will recojrnRa.e r`hanRes.. ii ariv. in handling costs on
<br />the site, labor. knit Mlatipn costs. Overhead, profit
<br />and other `►xp(+ni(,$
<br />4.9 SUPERINTENDENT
<br />4.9,1 Th{- Contractor shall M00% -1 competent superin.
<br />tendent and necessary assistants who shall be in attend-
<br />,rc€ .tt the ploiect Site during the progress of the Work.
<br />The superintendent shall represent the Contractor and all
<br />communications given to the superintendent shall be as
<br />binding as if given to the Contractor. Important commu-
<br />nications -hall be confirmed in %vnling. Other communi-
<br />cations shall be so confirmed on written request In each
<br />caW,
<br />4.10 PROGRESS SCHEDULE
<br />4.10.1 The Contractor, immedi,llcly after being awarded
<br />the Contract, shall prepare and Submit for the Owner's
<br />.� �— ,and Archltect'c inform,lt�ttn ,tn C�Stlmaled progress sched.
<br />AIA DOCUMENT A201 +np�UslpS
<br />oF)F<�aie8 A201-1976 A.IA O NEW COSTLCTIORK 1R\NTH EDITION VSTt1976E CRICN ,frrlCCs t5Rn�[�t N HD C:
<br />1
<br />F�
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />u
<br />J
<br />1
<br />Cl
<br />1
<br />
|