Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />L <br />1 <br />1 <br />1 <br />C] <br />1� <br />n <br />I <br />1 <br />L' <br />1 <br />ule for the Work. The progress schedule shall be related <br />to the entire Project to the extent required by the Con- <br />tract Documents, and shall provide for expeditious and <br />practicable execution of the Work. <br />4.11 DOCUMENTS AND SAMPLES AT THE SITE <br />4.11.1 The Contractor shall maintain at the site for the <br />Owner one record copy of all Drawings, Specifications, <br />Addenda, Change Orders and other Modifications, in <br />good order and marked currently to record all changes <br />made during construction, and approved Shop Drawings, <br />Product Data and Sample. These shall be available to <br />the Architect and shall bp delivered to him for the Owner <br />upon completion of thr2 Work. <br />4,12 SHOP DRAWIN(;S, PRODUCT DATA AND SAMPLES <br />4.12.1 Shop Drawings are drawings, diagrams, schedules <br />and other data specially prepared for the Work by the <br />Contractor or any Subcontractor, manufacturer, supplier <br />or distributor to illustrate some portion of the Work. <br />4.12.2 Product Data are illustrations, standard schedules, <br />performance charts, Instructions, brochures, diagrams and <br />other information furnished by the Contractor to illustrate <br />a material, product or system for some portion of the <br />Work. <br />4.12.3 Sai iples are physical examples which illustrate <br />materials, equipment or workmanship and establish <br />stands ds by which the %York will be judged.. <br />4,12.4 The Contractor shall teview. approve and submit. <br />with reasonable promptness and in such sequence as to <br />cause no delay in the Work of in the o 0#4 of the O+saner <br />or any separate conlraclot., .111 Shop Drawings, Product <br />Data and Samples required by the Contract Documents <br />4.12.S By approving and sulsmming Shop Drawings, <br />Product Data and Samples, the Contractor represents that <br />he has determined and vviii►r:d all materials. held meas- <br />urements. and field Conotuction Croicria r4la:ed tt'ferelo, <br />or will do so, ind that Iic has checked and cociedinated <br />the iniormallon contained within such submittals with <br />the tequitements of the work and of the Ctanlract Docu- <br />ments. <br />4.12.6 - is Contractor shill not be retiev d of responst- <br />cishiv for anv devolton irom the requirements of the <br />Contract Documents hN' the Atchllect'i Ipptoval of Shop <br />Drawings. Product Data of Samples under Subpatjgtaph <br />14 unless the Contractot has -,ptciiicaliv niorma:d the <br />Architect in wtitinR of such deviation m the time rai sub- <br />mission and the Architect has given w"ItC11 apprnval its <br />the specific deviation. The Contractor shall not be relieved <br />itom fesponsibilitx iot earroes or onii steins in the Shop <br />+;wr„nitw !,y the .a,rcholc�et`s <br />approval thelcot. <br />4.12.7 The Conlf.iclor shall direct spvcifiC attention, in <br />wtiong or on resubrnitttod Shop Drawings: Product Data <br />of Samples, to revisions rather than those requested by <br />the Architect on previous submittals. <br />4.12.8 do portion cat the Wotls requiring; submission of a <br />Shop Drawing. Product Data or Sample shall be com- <br />menced until the submittal has been approved by the <br />Architect as provided in Subparagraph 2.2.14. All such <br />portions of the Work shall be in accordance with ap- <br />proved submittals. <br />4.13 USE OF SITE <br />4.13.1 The Contractor shall confine operations at the site <br />to areas permitted by law, ordinances, permits and the <br />Contract Documents and shall not unreasonably encum- <br />ber the site with any materials or equipment. <br />4.14 CUTTING AND PATCHING OF WORK <br />4.14.1 The Contractor shall be responsible for all cutting, <br />fitting or patching that may be required to complete the <br />Work or to make its several parts fit together properly. <br />4.14.2 The Contractor shall not damage or endanger any <br />portion of the Work or the work of the Owner or any <br />separate contractors by cutting, patching or otherwise <br />altering any work, or by excavation. The Contractor shall <br />not cut or otherwise alter the work of the Owner or any <br />separate contractor except with the written consent of the <br />Owner and of such separate contractor. The Contractor <br />shall not unreasonably withhold from the Owner or any <br />separate contractor his consent to cutting or otherwise <br />altering the Work. <br />4.1S CLEANING UP <br />4.1S.1 The Contractor at all times shah keep the premises <br />fret.• from accumulation of waste materials or rubbish <br />caused by his operations. At the completion of the Work <br />he shall remove all i,,,is waste materials and rubbish from <br />and about the Protect as well as all his tools. construc- <br />lion equipment, machin,rty and surplus materials, <br />4.15.2 It the Contractor fails to clean up at the comple- <br />lion of the ,Yearn. the Owner may do so as provided in <br />Patagtaph 3 a and the i casl thereot shall be charged to the <br />Contractor, <br />4.16 COMMUNICATIONS <br />4.16.1 The Contractor shall totward all communrcatlons <br />the Owner through the Architect. <br />4.17 ROirALTIES AND PATENTS <br />4.17,1 The Contractor shall pay all toyalties and license <br />ices He shalt defend all suats or claims for infringement <br />of any patent fight% and •hall save the Owner harniles& <br />itorn Nisi on account there,jf„ v4cept that the Owner shall <br />he rt+monsitale tot an catch loss when a particular design. <br />t totes of thin product of a patticylar manufacturer or <br />manuiaclurers is :twciiied, but it the Contractor has rea„ <br />Still to believe that :he design. ptocess or product speci- <br />iied is an Ininngernent of a patent, tie shall be responsible <br />far iuch loss unIc5s he promptly gi%el such information to <br />the Architect. <br />4.1g INDEMNIFICATION <br />4.A.1 To thc* lulirst extent pernmed by late, the Con- <br />tractor shall indemnity and hotef aarmless the Owner and <br />the architect and their agents and employees from and <br />against all claims, damages. losses and expenses, including <br />but not limited to attorneys' fees, arising out of or result- <br />ing from the performance of the Work, provided that <br />any such claim, damage. loss or expense (1) is attributable <br />to bodily trilury, sickness, disease or death. or to injury <br />to or destruction of tangible properly iother than the <br />Work itself! including the loss of use resulting therefrom, <br />AIA DOCUMENT A201 * GENERAL CONDITIONS OF THE CONTRACT IOR CONMUCIION • T14IRTEE14TH EDITION . AUGUST,1976 ''d1-19iEi 9 <br />AiA4 • ,E, 19'6 • THE A�IERICAN INSTITUTE riF ARCHITECi$ 17as NEW WORK AVENUE. N N . WASHINGTON.. D.0 20" A21 <br />