My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01677
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 8:55:54 AM
Creation date
2/16/2024 8:48:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1677
Planning Files - Type
Special Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />DIVISION 0 <br />- CONDITIONS OF THE CONTRACT <br />00800 - SUPPLEMENTAL CONDITIONS <br />I. SCOPE AND <br />INTENT <br />A. The Supplemental Conditions modify, amplify, delete and/or add to the <br />General Conditions. Where an <br />the General Conditions is amendedtbylthepSupplementalbCondition or part in <br />provisions of such articles Conditions, to <br />amended shall remain in effect. <br />aragraphs, subparagraphs or parts not so <br />B. The following provisions are supplemental to the General Conditions of the <br />Contract, AIA Document A2019 August 1976 edition, and where any of the <br />following provisions conflict wit <br />h the AIA Document, these supplemental <br />provisions shall prevail. Whenever the Supplemental General Conditions do <br />not designate on which line a word or words are changed, the change shall <br />apply in each instance that the word or words are used i <br />article or paragraph, n the referenced <br />2. ARTICLES OF SUPPLEMENTAL CONDITIONS TO TIE GENERAL CONDITIONS <br />Article 1 - Contract Documents: <br />A. Add the following new subparagraph 1.1.5 Lo 1.1: <br />"1.1.5 PROJECT MANUAL <br />The Project Manual is the volume which includes the Bidding Documents <br />requirements, sample forms and certain of the Contract Documents such as <br />the Conditions of the Contract and the Specifications." <br />B. Add the following to subparagraph 1.2.3: <br />Detailed specifications shall take priority over general specifications <br />and larger scale drawings shall take <br />precedence over smaller scale <br />drawings. In case of disagreement between the drawings and <br />specifications, or within either document itself, the better quality or <br />greater quantity of work shall be estimated <br />Owner's/Architect's attention for decisioand the matter drawn to the <br />C. Add the following to subparagraph 1.2.4: <br />"Wherever any provision of any Section of the Specification conflicts with <br />any agreements or regulations of any kind <br />at any time in force among <br />membes of any Trade Associationv Unions, or Councils, which regulate or <br />distinguish <br />what work shall or shall not be included in the work of any <br />particular trade, the Contractor shall make all <br />necessary arrangements to <br />reconcile any such conflicts without delay, damage, or cost to the Ow ner <br />and without <br />recourse to the Architect or the Owner." <br />5264 <br />SECTION 00800 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.