My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01677
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 8:55:54 AM
Creation date
2/16/2024 8:48:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1677
Planning Files - Type
Special Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fJ <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />01100 - SPECIAL CONDITIONS <br />8. DRAWINGS SHOWING CHANGES DURING CONSTRUCTION <br />A. (Each) Contractor, and his major subcontractors, shall maintain an up-to- <br />date set of full size drawings on <br />which he shall carefully and accurately <br />record all field changes of location, layout, es <br />made in nd other cand <br />lona <br />actual construction from what was indicated drawings, gfor <br />which he has responsibility. <br />B. <br />When construction <br />lion is completed and before final payment is certified by <br />the Architect, one <br />set of specifications and one of clean, undamaged, full <br />size prints showing all field changes accurately recorded thereon <br />and <br />additional information specified in Section: 01720, Project Record <br />Documents, shall be <br />given to the Owner, <br />9. SITE SECURITY <br />A. Each Contractor to be responsible for his materials, tools, and equipment <br />at all times during construction. <br />Each Contractor to be responsible for, <br />and make good, any loss or damage due to vandalism or robbery during <br />construction. <br />10. DELIVERY AND STORAGE AREAS <br />A. (Each) Contractor shall schedule deliveries and unloadingto prevent <br />congestion, blocking of access to project site, and interference with the <br />work. Arrange deliveries to avoid larger <br />accumulations than can be <br />suitably stored at site. <br />B. Provide for continuity of supply to avoid change of supplier or <br />manufacturer, or change in brand materials during work. <br />C. Store materials in such a manner as to prevent damage to materials or <br />structure and to prevent injury to <br />persons. <br />11. USE AND OCCUPANCY PRIOR TO FINAL ACCEPTANCE BY OWNER <br />A. The Owner shall have the right to take possession of and use any completed <br />or partially completed portions of the work, notwithstanding the time for <br />completing the entire work <br />or any portions thereof may, or may not, have <br />expired. Such taking possession and use shall not be deemed a final <br />acceptance of any work until all the work has been completed in accordance <br />with the Contract Documents. If such <br />prior use increases the cost of, or <br />delays the work, the Contractor will be granted such extra compensation or <br />extension of time, or both, as the Architect and Owner may recommend, <br />subject to the approval of the Owner. <br />5264 <br />SECTION 01100 _ 3 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.