My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01677
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 8:55:54 AM
Creation date
2/16/2024 8:48:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1677
Planning Files - Type
Special Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 <br />SITE WORK <br />02510 - BITUMINOUS PAVING <br />1. <br />GENERAL <br />A. <br />The Contractor shall furnish all labor, materials, tools, equipment and <br />perform all services necessary for or incidental to the furnishing and <br />installation, complete, of all hot asphaltic paving and base material, as <br />shown on drawings and as specified, laccordance <br />otherthe <br />workprovisions <br />completely coordinated withwith <br />Contract Documents, and <br />trades. <br />B. <br />Although such work is not specifically shown or specified, all <br />devices incidental <br />supplementary lementar or miscellaneous items, appurtenances and <br />for a sound, secure andinstallation shall be <br />to or necessary klete <br />furnished and installed as part oftwor <br />C. <br />Work required under this section includes, but i s not limited to the <br />following: <br />of base material, <br />1. New bituminous surface: the mixing and/or placing <br />mixing and placing of asphaltic concrete wearing course. <br />D. <br />Related work specified elsewhere: <br />1. Section 02200 - Earthwork <br />2. Section 02620 - Site Concrete <br />3. Section 09900 - Painting <br />E. <br />nesor o a Department of <br />Work will be done according to provision feMinnesota <br />way <br />Transportation (MN DOT) - Standard Specifications <br />Construction, dated January, 1978 edition. <br />F. <br />Contractor will be responsible for erecting any necessary barricades. <br />2, <br />QUALITY ASSURANCE <br />A. <br />Use materials which are furnished by bulk asphalt concrete poducers <br />hot hot -laid asphaltic concrete. <br />regularly engaged in production of -mixed, <br />B. <br />Prepare subgrade and place base and wear surface in accordance with MN DOT <br />Specifications for Highway Construction. <br />C. <br />Job conditions: <br />1. Weather Limitations: construct asphalt concrete courses lywhenis <br />F., when the underlying b <br />atmospheric temperature isabove35 <br />r <br />dry, and when weather is nrainy. <br />i nesandurse during ugrades, <br />2. Grade Control: Establish and maintainth required lines <br />including crown and cross -slope for each ction <br />operation. <br />SECTION 02510 - 1 <br />5264 <br />1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.