Laserfiche WebLink
B <br />DIVISION 2 <br />SITE WORK <br />02901 - PLANTING SOIL, SODDING, & LANDSCAPING <br />B. <br />Place a layer of 6 mil polyethylene under all river rock <br />a minimum of 2" at all edges. Neatly cut holes <br />for any trees, shrubs, or <br />structures; i.e.; signs, lights. <br />C. <br />Place <br />flexible edging as indicated. <br />11. <br />CLEAN UP <br />A. <br />Soil, manure or similar material brought into paved areas by work <br />operations shall be <br />removed promptly, keeping these areas clean at all <br />times. Upon completion of sodding and plantings, excess <br />soil, stones and <br />debris not previously cleaned up shall be disposed of as directed by the <br />Architect. <br />B. <br />All ground areas disturbed as a result <br />restored to their original condition nce. be <br />oro oldesiredeneweappeararation <br />appearance. <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />i <br />5264 SECTION 02901 - 10 <br />1 <br />