My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01776
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1700-1799
>
pf_01776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 1:20:21 PM
Creation date
2/16/2024 9:33:44 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1776
Planning Files - Type
Planning-Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
business park development with an ulttmate build —out area of <br />946,700 square feet occupying a 56.4 acre site. The <br />proposed project is a modification Co planned development <br />currently under construction in the City of Roseville. The <br />site is bounded on the south by Interstate (I) 35W <br />Northbound Ramp Terminal, on the north b the west by I-35W, and on the east b y County Road D, on <br />project will consist of 665,000 square Cfeet lOfdOfficeeTe <br />' <br />space <br />131,700 square feet of office <br />Square foot hotel with l� <br />service saCe, and a 150,000 <br />150 rooms. These quantities <br />represent an increase of 423,300 square feet in office <br />space, and a decrease in office service space from the 1986 <br />permit. No hotel was 1 <br />the p proposed in 1986 permit, therefore, <br />pro osed modification is a net increase of 299,620 <br />square feet. The total development will also include up to <br />4,380 parking spaces, 950 of which are the addition for <br />which the permit modification is being sought. <br />PART II. AUTHO.^.IZATIONS INFORMATION SOURCES AND DEFINTIONS <br />A• Centre Pointe Business Park Authorized. <br />This permit authorizes the first permiittee to construct the <br />Centre Pointy Business Park Project, as described above, <br />including associated parking spaces <br />authorization , subject to receipt of <br />of construction from the second permittee and <br />subject to any limitations and/or additional requirements in <br />the Special and General Conditions contai <br />and IV, of this permit. ned in Parts IIt. <br />B. Certain Roadway Construction Prohibited. <br />This permit does not authorize construction of any <br />additional roadways needed for the project which would <br />otherwise require a separate ISP. <br />C. Exhibits and Plans. <br />1. Submitted Information. <br />Exhibits and plans which <br />further describe the project are in the information <br />which was submitted to the Minnesota Pollution Control <br />Agency (hereafter Agency) in su <br />pot of the <br />for this permlt. That informationrinccludes;application <br />a• the ISP application for the <br />project receive <br />February 10, 1986; d on <br />b• a supplemental noise analysis for the ISP <br />application received on March 26, 1986; <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.