Laserfiche WebLink
5. Although existing traffic control on CR B-2 and Dale Street are <br />satisfactory, the installation of traffic signal control appears to <br />meet Nh= warrants an Dale Street at CR B-2 and Dale Street at Zii <br />�. ,. <br />• detailed <br />36 Street, based on projected traffic A more _ <br />warrant analysis will be required to de actual feasibility for <br />installation of traffic signal control. be provided before the signals <br />would be installed. <br />6. The development will not significantly increase traffic activity or <br />hazard during school peak periods or events staged at Central. Park or <br />the church adjacent to the site. <br />7. Children crossing to Central Park School will be Wider the cxntrol of <br />dross' during r' roach and periods. <br />school �r�g guards �x�g primary approach � <br />Crosswalks should be formally established at the new intersections. <br />r <br />t <br />24 <br />