Laserfiche WebLink
v <br />EXHIBIT #12 <br />23. Will the project generate (either during or after construction): <br />a. Air Pollution? No, <br />b. Dust? Yes <br />Dust will be generated during the construction phase of the proposed <br />development. Mitigative measures will include: 1) Watering to <br />control dust generation; 2) Excavation in phases to minimize the <br />areas of dust generation. <br />c. Noi.,e? Yes <br />- for grading and construction will <br />Noise generated b heavy equipment ment <br />0 <br />8 Y Y q P 8 8 <br />constitute a short-term adverse impact. This equipment will be <br />muffled in accordance with applicable state regulations. The hours <br />of operation will also be controlled. <br />No unique noise sensitive receptors have been identified in the <br />project area. <br />d. Odors? No <br />