My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01483
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1400-1499
>
pf_01483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:30:14 PM
Creation date
2/16/2024 12:26:49 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1481
Planning Files - Type
Planning-Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 - #120-10689 <br />The elevation of 5000 psf bearing soils is substantially below <br />estimated bottom of footing elevation at several boring locations. In <br />these areas, it is our judgment it would be best to construct the <br />foundations at normal depth below the lower floor slab after placement <br />of a compacted fill. <br />In addition to the required depth of fill, the excavated area must be <br />oversized to provide suitable lateral support. In areas where swamp <br />deposits are not encountered during the excavating we recommend an <br />oversize beyond the planned edge of footing equal to 2' plus 1' for <br />each foot of compacted fill that will be required below the footing at <br />that location. In areas where swamp deposits are encountered, we <br />recommend the excavation be oversized from the planned outside edge of <br />footing a distance equal to at least 2' plus 1 1/2' times the depth of <br />fill required below the footing at that location. <br />Groundwater may be encountered during the excavating in some portions <br />of the site. Dewatering will therefore be required to provide a <br />relatively dry excavation for proper observation of the exposed soils <br />and also placement of the compacted fill. If the excavated area is <br />relatively wet, we recommend the initial few feet of compacted fill be <br />a relatively clean granular soil with less than 5% passing the #200 <br />sieve. The remainder of the fill should also be granular, perferably <br />with less than 10% passing the #200 sieve. We recommend all fill <br />placed below planned bottom of footing elevation be compacted to a <br />SOIL exPLOfaB r1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.