Laserfiche WebLink
line along the south of the buildings <br />The proposed sanitary sewer 9 <br />will flow east to the 21-inch trunklthe buildings ne in iew will f ow north <br />sanitary sewer line along the east of <br />to the 10-inch sanitary sewer main in County Road B2. <br />The watermains will be looped north watermainthe lin1 Fairview Avenuein <br />County Road 62 and east of the 16 i nc .� from a sanitary <br />Sanitary sewer service to the restaurant will <br />sewer line extension from a manhole on thrhethe i12 i nchtrunk <br />watermai n Tin <br />watermain service will � from <br />weatermain in Fairview Avenue. <br />County Road B2 or the 16-i ch <br />E. LANDSCAPE <br />The main objectives of the landscape designre oassuv ewsrto cparking <br />bi 1 i ty with the surrounding properties, si n center. <br />maintain visibility to the shopping <br />and service areas and <br />and <br />Seasonal interest is provided with a mixture ofruitn fruiting fall <br />flowering, <br />deciduous plant materials, many with <br />color characteristics. <br />ad colorful the and archi- <br />Foundation plantings soften the ground plane <br />boarder l a invit- <br />provides <br />tecture. An annual /perenni al p <br />tectu e, <br />experience along the eastern approach. <br />ing entry <br />F. LIGHTING <br />Generally, site lighting of parking areas will be provided by 40' <br />Service areasandthe rear of <br />high pole -mounted light fixture5• <br />be illuminated by wall -mounted fixtures. <br />building will <br />G. ARCHITECTURE <br />The center will be constructed of quality materialsincorporand apreg <br />brick accents <br />brick with architectural concrete accents, <br />finished architectural metals. <br />IV. CONCLUSION <br />The General <br />of <br />Development Plan is consist�an has withtheoals and <br />the City of Roseville. The P designed t <br />general <br />provide <br />appear- <br />policies <br />identity withspecialemphasis on a unified <br />an aesthetic <br />ance through <br />visual <br />building design and site <br />We respectfully <br />request approval of a Rezoning and a Special Use <br />Permit. <br />11 <br />1 <br />